Laserfiche WebLink
March 2004. The Study's project team includes a utility consultant charged with <br />developing conceptual designs to enable the incorporation of these utility improvements <br />into the overall design of the State's Urban Reconstruct Road Project, The State's Urban <br />Reconstruct Road Project will convert the existing rural section between the <br />Orange/Seminole County line and Lake of the Woods Blvd. into an urban roadway <br />design. There are significant costs savings available for this project if it is designed and <br />constructed as a part of the State's roadway project. <br /> <br />The attached Project Summary provides mapping details of existing and proposed <br />infrastructure, as well as a range of preliminary cost estimates. It is anticipated that a <br />multi-party interlocal agreement will be necessary to formalize the commitments and <br />timelines associated with the implementation plan and to establish utility customer service <br />areas. <br /> <br />At their February 28, 2003 meeting, the US 17-92 Redevelopment Planning Agency <br />directed staff to work with the County's utility to get the US 17-92 Fern Park area in their <br />master planning efforts. <br /> <br />Attachments: Fern Park Area Utilities improvements Project Summary <br /> <br /> <br />