FERN PARK UTILITIES LMPROVEMENTS PROJECT <br />Implementation Plan <br /> <br />Design and construct centralized potable x~ ater and sanilary sewer lines (or exlensions of <br />existing systems/in areas along US 17-92 where these facilities do not presently exist {see <br />maps). It is anticipated that the installation construction of the improx ements can be <br />accomplished through the State Urban Reconstruct Project. <br /> <br />Players: <br />Seminole Count>'. City ofAhamome Sphngs. City of Casselberry. L'S 1 'r-92 CR.~.. CDBG <br /> <br />Proposed Financin~ Plan: <br />Municipal Utility lands - respective utility to provide 1/3 of total cost of construction <br />CDBG funds -provides 1/3 of total cost of construction <br />CRA funds - provides l ;3 of total cost of construction <br /> <br />Kev Events: <br />· Imerlocal agreement - multi-party interlocal agreement will need to be executed between <br /> the cities, the County and the US 17-92 CRA to formalize corranitmems of each entity, <br /> confirm funding and schedule, and to address any utility sen'ice issues tha~ need to be <br /> resolved <br />· CDBG funding - an application for funding a portion of the improvements is targeted for <br /> the FY04/05 CDBG grant allocation <br />· CRA funding - project funding (CP,_~ share) will need to be adopted into the FY04/05 <br /> CRA budget <br />· Utility funding - project funding (municipal utility portion) will need to be included in the <br /> FY04/05 budget and confirmed within the Capital Improvements Element of each <br /> murdcipality <br />· Fern Park Development Framework Study - will provide the conceptual./preliminary <br /> design of the improvements funded by the US 17-92 CRA <br />· State Urban Reconstruct Project - convert the existing rural section between the <br /> Orange/Seminole County line and Lake of the Woods Blvd. into an urban roadway <br /> section/curb and gutter. The design phase is scheduled to begin in early 2004 and <br /> provides an opportunity for the inclusion of these utility improvements within the overall <br /> scope of the FDOT roadway project. <br /> <br />Schedule: <br />· Jan-March 2004 - preparation and consideration of multi party interlocal a~eement <br />· March/April 2004 - completion of conceptual/preliminary utility designs as part of the <br /> Fern Park Development Framework Study <br />· April 2004 - incorporation of conceptual/preliminary utility designs into the design phase <br /> of the State Urban Reconstruct Project <br />· October 2004 - approve project funding within each entity's respective annual capital <br /> budget including CDBG and CRA approvals <br />· 2005 - Construction of utility improvements as part of State Urban Reconstruct Project <br /> <br /> <br />