My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC Minutes 03/08/2004
Laserfiche
>
City Clerk's Public Records
>
Minutes
>
City Commission Minutes
>
City Commission Minutes Archives
>
2004 City Commission Minutes
>
CC Minutes 03/08/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2005 2:54:31 PM
Creation date
6/3/2004 10:47:13 AM
Metadata
Fields
Template:
City Clerk
Meeting Type
Workshop
City Clerk - Doc Type
Minutes
City Clerk - Date
3/8/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SEMINOLE COUNTY GOVERNMENT <br /> AGENDA MEMORANDUM <br /> <br />SUBJECT: Fern Park Area Utilities Improvements Project <br /> <br />DEPARTMENT: Economic Development DIVISION: US 17-92 CRA <br /> <br />AUTHORIZED BY: William McDerm ONTACT: Kevin Fall EXT, 7133 <br /> <br />Agenda Date 01/27/04 <br /> <br />Regular [] Consent[] <br />Public Hearing - t:30 [] <br /> <br />Work Session [] Briefing <br /> Public Hearing - 7:00 [] <br /> <br />MOT ON/RECOMMENDATION: <br /> <br />Request Board direction regarding the Fern Park Area Utilities Improvements Project <br /> <br />BACKGROUND: <br /> <br />To address one of the strategic objectives of the US 17-92 Corridor Redevelopment Plan, <br />the Seminole County Environmental Services Department, working in coordination with <br />staff from the cities of Altamonte Springs and Casselberry and from the US 17-92 CRA, <br />has developed preliminary cost estimates for the proposed Fern Park Utilities <br />Improvements Project. <br /> <br />Over the past several months, a project team has been meeting to develop a strategy and <br />implementation plan to ensure that all areas within the Fern Park section of the US 17-92 <br />CRA are equipped with centralized potable water and sanitary sewer services. There are <br />several areas along both sides of US 17-92 where centralized potable water and/or <br />sanitary sewer systems are deficient or non-existent. The utility providers in these areas <br />are Seminole County, and the cities of Altamonte Spdngs and Casselberry. <br /> <br />The proposed strategy calls for the cities of Casselberry and AItamonte <br />Spdngs to extend service to both the eastern and western sides of the US 17- <br />92 corridor. The proposed financing plan calls for the use of Community <br />Development Block Grant funds and US 17-92 CRA funds, to assist the <br />respective utilities in covering the costs of constructing these improvements. <br /> <br />From a timing perspective, it is important that the implementation plan be <br />developed in concurrence with the Fern Park Development Framework Study. <br />This CRA study is presently underway and scheduled for completion in late <br /> <br />Reviewed by:. <br />Co Atty. <br />DFS: <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.