My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC Minutes 08/14/2006
Laserfiche
>
City Clerk's Public Records
>
Minutes
>
City Commission Minutes
>
City Commission Minutes Archives
>
2006 City Commission Minutes
>
CC Minutes 08/14/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2006 2:34:28 PM
Creation date
10/20/2006 2:34:28 PM
Metadata
Fields
Template:
City Clerk
Meeting Type
Regular
City Clerk - Doc Type
Minutes
City Clerk - Date
8/14/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />City Commission Meeting <br />August 14, 2006 <br />Page 5 <br /> <br />B. Resolution 06-1698 - Amendment No.2 to Supplemental Agreement No 3 of the Continuing <br />Services Contract with Transportation Engineering, Inc. for Design of the Re-alignment of North <br />Winter Park Drive ($34,415.00) <br /> <br />The City Clerk read Resolution 06-1698 by title as follows: <br /> <br />"A RESOLUTION OF THE CITY OF CASSELBERRY, FLORIDA, AUTHORIZING <br />THE EXECUTION OF AMENDMENT NO.2 TO SUPPLEMENTAL AGREEMENT <br />NO. 3 TO THE CONTINUING SERVICES CONTRACT FOR ADDITIONAL <br />SURVEY, GEOTECHNICAL EVALUATIONS AND TRANSPORTATION <br />ENGINEERING SERVICES WITH TRANSPORTATION ENGINEERING, INC. <br />D/B/A TEl, FOR DESIGN OF THE RE-ALIGNMENT OF NORTH WINTER PARK <br />DRIVE; PROVIDING FOR CONFLICTS, SEVERABILITY, AND EFFECTIVE <br />DATE." <br /> <br />Staff Presentation: Resolution 06- I 698 authorizes Amendment No.2 to the City continuing services <br />contract for additional survey geotechnical evaluations and transportation engineering services with <br />Transportation Engineering, Inc. (TEl) for design of the re-alignment of North Winter Park Drive. These <br />services along North Winter Park Drive extend from Seminola Boulevard to State Road 434, with the north <br />end of the project traversing the newly platted Northeast Industrial Park. The proposed roadway realignment <br />provides traffic flow and pedestrian improvements. The connection to State Road 434 serves as another <br />entrance to the City and provides an excellent opportunity to incorporate landscaping and irrigation to <br />beautifY the roadway. Amendment No.2 provides for landscape and design services and well as for the <br />relocation of a 6" water main that needs to be relocated within the proposed right of way. The cost <br />associated with the services outlined in Amendment No, 2 is $34,415.00, which is budgeted in the <br />Infrasructure Surtax Fund (114-0710-541.63-43). <br /> <br />Staff Recommeudation: Approve Resolution 06-1698 as presented. <br /> <br />MOTION: <br /> <br />Moved by Commissioner Colleen S. Hufford to approve Resolution 06-169S, <br />Continuing Services Contract with TEl for re-alignment design of Winter <br />Park Drive, as presented. Motion was seconded by Commissioner Linda Hart <br />and carried on a 5 - 0 vote. <br /> <br />C. Resolution 06- I 699 - Amendment No.2 to Supplemental Agreement No. I of the Continuing <br />Services Contract with Transportation Engineering, Inc. For design ofthe Re-alignmentofPlumosa <br />Avenue ($38,971.82) <br /> <br />The City Clerk read Resolution 06-1699 by title as follows: <br /> <br />"A RESOLUTION OF THE CITY OF CASSELBERRY, FLORIDA, AUTHORIZING <br />THE EXECUTION OF AMENDMENT NO.2 TO SUPPLEMENTAL AGREEMENT <br />NO. 1 TO THE CONTINUING SERVICES CONTRACT FOR ADDITIONAL <br />SURVEY AND TRANSPORTATION ENGINEERING SERVICES WITH <br />
The URL can be used to link to this page
Your browser does not support the video tag.