My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-1582 Electrical Eng. Supp. 2
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2005 Resolutions
>
05-1582 Electrical Eng. Supp. 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2005 2:55:05 PM
Creation date
5/13/2005 4:45:07 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
5/9/2005
Doc Number
05-1582
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Supplement No. 1 <br />Page30f6 <br /> <br />3. ENGINEER shall coordinate with the local utility company as to the <br />relocation of the normal power feed to both the City Hall and Public <br />Works Admin buildings and associated pad-mounted transformers. <br /> <br />4. ENGINEER shall provide fuel piping design associated with the <br />proposed generator systems at City Hall and the Public Works/Fire <br />Administration Building. <br /> <br />5. ENGINEER shall obtain the services of a registered structural engineer <br />for the foundation design associated with the proposed 250 kW <br />generator and the relocated 125 kW generator. <br /> <br />6. ENGINEER shall prepare project specifications and opinion of <br />probable construction costs. <br /> <br />SECTION 3 <br /> <br />SUPPLEMENTARY SERVICES OF THE ENGINEER <br /> <br />A. If authorized by the OWNER, the ENGINEER shall furnish or obtain from <br />others, supplementary services of the fOllowing types which will be paid for <br />by the OWNER as an additional cost as outlined in Section 5. <br /> <br />B. Additional services due to significant changes in the scope of the project <br />or its design including, but not limited to, changes in size, complexity, <br />character of construction, or due to time delays in initiating or completion <br />of the work as described herein. <br /> <br />C. Provide through sub consultants, surveys, soils, environmental scientist <br />services, construction quality control testing or other specialist services. If <br />these services are subsequently determined advisable during the course <br />of the work, they may be considered for authorization as an additional <br />service under this Section or separately provided by the OWNER. <br /> <br />D. Except as otherwise provided therein, services or additional costs <br />associated with revising previously accepted studies, reports or other <br />documents prepared by the ENGINEER when such revisions are due to <br />causes beyond the ENGINEER's control. <br /> <br />E. Additional services resulting form public protests, administrative hears or <br />similar matters. <br />
The URL can be used to link to this page
Your browser does not support the video tag.