Laserfiche WebLink
<br />Supplement No. 1 <br />Page 4 of6 <br /> <br />F. Preparing to service and/or serving as an Expert Witness for the OWNER <br />in any litigation, public hearing, condemnation proceeding, right-of-way or <br />easement acquisition or negotiation or other legal/administrative <br />proceeding(s). <br /> <br />G. Furnishing additional sets of prints of drawings and other documents <br />beyond those designated in Section 2. <br /> <br />H. Additional engineering services required by revisions to regulations (after <br />the date of this Supplement) as applicable. <br /> <br />I. Additional services in connection with the project including services <br />normally furnished by the OWNER as described in Section 4 herein and <br />services not otherwise provided for in this Supplement. <br /> <br />SECTION 4 <br /> <br />OWNER RESPONSIBILITIES <br /> <br />In addition to specific responsibilities hereinbefore described, the OWNER will: <br /> <br />A. Advise the ENGINEER of his requirements for the project and designate a <br />person to act as the OWNER's representative with respect to the work to <br />be performed under this Supplement and such person shall have <br />complete authority to transmit instructions, receive information, interpret <br />and define the OWNER's policies and decisions pertinent to the work <br />covered by this Supplement. <br /> <br />B. Obtain and provide date requested that is reasonably available on the <br />project along with operational and maintenance requirements and <br />easement and right-of-way requirements. <br /> <br />C. Guarantee access to and make all provisions for the ENGINEER to enter <br />upon public and private lands as required for the ENGINEER to perform <br />his work under this Supplement. <br /> <br />D. Make facilities accessible for inspection. <br /> <br />E. Examine all studies, reports, sketches, schedules and other documents <br />presented by the ENGINEER and render decisions pertaining hereto <br />within a reasonable time so as not to delay the work of the ENGINEER. <br />