Laserfiche WebLink
<br />Supplement No. 1 <br />Page20f6 <br /> <br />SECTION 1 <br /> <br />PURPOSE OF SUPPLEMENT <br /> <br />The purpose of this supplement is to evaluate the existing Public Works Admin 125 kW <br />standby generator and new 250 kW City Hall standby generator as they relate to their <br />respective buildings. Evaluate electrical systems each building and redesign said <br />systems and standby generators to be connected. <br /> <br />SECTION 2 <br /> <br />SCOPE OF PROFESSIONAL ELECTRICAL ENGINEERING RELATED <br />SERVICES <br /> <br />A. Task 1 - Preliminary EnaineerinCl <br /> <br />1. ENGINEER shall evaluate the existing standby generators and the <br />proposed 250 kW generator as they relate to City Hall, the Public <br />Works/Fire Administration Building and the former Fire Station No. 21. <br />Evaluation shall also include the electrical systems of each of the <br />aforementioned structures. <br /> <br />2. ENGINEER shall prepare a report including recommendations and <br />budgetary cost estimate for proposed upgrades, in an executive type <br />summary format. <br /> <br />B. Task 2 - Final Desian <br /> <br />1. ENGINEER shall provide electrical design associated with <br />modifications to the site generator systems at City Hall, the Public <br />Works/Fire Administration Building and the former Fire Station No. 21. <br />Services shall include the completion of drawings for the work, in <br />accordance with a format determined by the OWNER. <br /> <br />2. ENGINEER shall provide the design associated with the relocation of <br />the 125 kW generator and associated distribution equipment adjacent <br />to the Public Works/Fire Administration Building to the southeast side <br />of that building to allow for the proposed park improvements. <br />