My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 03/07/2023 Minutes
Laserfiche
>
City Clerk's Public Records
>
Minutes
>
City Commission Minutes
>
City Commission Minutes Archives
>
2023 City Commission Minutes
>
CC 03/07/2023 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2023 1:58:36 PM
Creation date
7/25/2023 1:58:20 PM
Metadata
Fields
Template:
City Clerk
Meeting Type
Regular
City Clerk - Doc Type
Minutes
City Clerk - Date
3/7/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CASSCLBERRY CITY COMMISSION <br />Minutes of March 7, 2023 — Pre -Budget Planning workshop <br />Page 7 of 11 <br />Public Works Department — Public Works — Public Works Divisions Director Lenny Barden <br />- Capital — FY 2023 — Parks <br />- Initiatives — Mobility <br />- Capital FY 2023 — Mobility <br />- Capital FY 2024 & FY 2025 — Mobility <br />- Initiatives— Stormwater <br />- Capital FY 2023 — Stormwater <br />- Capital FY 2024 & FY 2025 — Stormwater <br />- Capital — Facilities <br />- FY 2023 — 2025 Capital Equipment & Miscellaneous Public Works Divisions <br />- Unfunded Needs <br />o Parks <br />■ Brightwater <br />■ Sunnytown Park Improvements <br />■ Golf Club <br />■ Electrical improvements along promenade at Lake Concord Park <br />■ Dog Park improvements <br />o Mobility <br />• Various traffic calming <br />■ Various bike/ped improvements <br />■ SR 436 -US 17-92 to Wilshire Drive improvements <br />■ Winter Park Drive Complete Street <br />• Sillahadow sidewalk repair <br />■ Lalnplite Way safety & access improvements <br />o Stormwater & Lakes Management <br />■ Howell Creek <br />■ Carriage Hill Outfall Rehabilitation <br />■ Sausalito Condo Trunk Line Rehabilitation <br />■ Gee Creek Cell Clearing <br />■ Conservation Area Trail Extension <br />■ Various stormwater/flood studies and improvements <br />■ Park Drive Drainage/wetland improvements <br />■ GIS and technology enhancement <br />■ Boat launch improvements for Grassy Lake <br />■ Additional erosion control, nitrogen removal, and miscellaneous stormwater <br />projects <br />■ 711i St Drainage Improvements (Study) <br />■ Multi -Weir Flood Control (Study) <br />Stormwater and Lakes Management Master Plan <br />o Facilities <br />■ Facilities Master Plan <br />■ City Hall chiller replacement <br />■ Renovate Public Works & Utilities Administration and City Hall bathrooms <br />■ Golf Course clubhouse replacement <br />■ Replacement Generator(s) Public Works & Utilities Administration and <br />City Hall <br />Operational/Maintenance Changes <br />
The URL can be used to link to this page
Your browser does not support the video tag.