My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-2207 No.2 Continuing Consultant Agreement for ProfessionalWater/Sewer Utility Engineering Services with Brown & Caldwell
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2010 Resolutions
>
10-2207 No.2 Continuing Consultant Agreement for ProfessionalWater/Sewer Utility Engineering Services with Brown & Caldwell
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2022 11:42:29 AM
Creation date
8/17/2022 11:41:42 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
12/13/2010
Doc Number
10-2207
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Casselberry <br />1.1.13 Records of rainfall prior to, during and after Tropical Storm Fay <br />1.1.14 Location and information for up to six properties that were rezoned for higher density. In- <br />clude any planning level flow projections for these areas. <br />1.1.15 Location and information for up to four areas where new sewer service is desired. In- <br />clude any planning level flow projections for these areas. <br />1.2 Data Organization and Summary - CONSULTANT will review the data collected and organize and <br />summarize it for review <br />Deliverables: <br />1. Kickoff Meeting <br />2. Data Organization Summary <br />SUBTASK 002 - Site Visits, CCTV Viewing and Data Validation <br />Objectives: <br />The objective of this subtask is to validate data through relevant site visits within the collection system <br />with CITY staff and to obtain representative visual information from existing CCTV data. <br />Activities <br />2.1 Site Visits - Conduct an eight hour site visit and take photographs of selected existing visible <br />facilities such as pump stations, air release valves and manholes. <br />2.2 CCN Information - CONSULTANT spend 16 hours viewing and documenting a limited number of <br />existing DVDs of CCN information to obtain an understanding of the interior condition of gravity <br />sewer pipes. CONSULTANT will create photographs of selected pipe conditions found during the <br />viewing. <br />2.3 CONSULTANT will consolidate data, photographs and maps for presentation to CITY staff for <br />validation. <br />2.4 CONSULTANT will conduct a workshop with CITY staff to validate the material obtained to date. <br />Gaps or errors will be identified at this meeting. <br />Deliverables: <br />1. Data validation workshop with CITY staff <br />SUBTASK 003 - RECOMMENDATIONS AND PRESENTATION <br />Objectives: <br />Develop recommendations and probable construction cost estimates for the Collection System Capital <br />Improvement Program. <br />Activities <br />3.1 CONSULTANT will evaluate data and prepare draft recommendations and cost estimates for <br />consideration by CITY staff. Recommendations will be prepared in the areas of Aging Infrastruc- <br />ture, Serving Additional Customers, and the Impact of Rezoning. The recommendations will ad- <br />dress issues of infiltration and inflow (1/1), renewal and replacement (R&R) funding for gravity <br />mains, force mains and pump stations, serving new customers, and the impact of increased flow <br />from rezoned areas. The recommendations will be presented in the form of: maps, photographs, <br />information tables, probable construction cost estimates, priorities, and limited narratives as ap- <br />` tl�i G1P I G''. I., li.'. i. -I F;; l' on -r:GDe i ii ,I j0�-/fir.. Ind. <br />
The URL can be used to link to this page
Your browser does not support the video tag.