My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-2162 Approval/Execution of Supplemental Agreement 2 to the Standard Consultant Agreement-Continuing Pro Water/Sewer utility Engineering Services
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2010 Resolutions
>
10-2162 Approval/Execution of Supplemental Agreement 2 to the Standard Consultant Agreement-Continuing Pro Water/Sewer utility Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2022 1:13:36 PM
Creation date
8/16/2022 1:12:07 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
8/23/2010
Doc Number
10-2162
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRAFT <br />REI will add future scenarios to the hydraulic model on the existing CIP and the previous <br />Water Master Plan projects. The population and water demand projections developed in <br />Task 3.0 will be used to allocate the water demand for each future scenario year. This <br />will include all anticipated areas to be served by the City including proposed annexations, <br />if any. <br />Task 7.1 - Scenario Management <br />REI will: <br />- Setup hydraulic model scenarios to include future conditions of average day, <br />maximum day and peak hour demands, and maximum day fire flow conditions. <br />Utilize the updated water demand projections (Task 3.0) to update modeling steady <br />state scenarios (ADF, MDF, PHF) for the existing year (2010).to develop fixture <br />demand sets for the 2015 and 2020 scenarios. <br />- Coordinate with City staff to identify scenarios that will be used evaluate the <br />distribution system. <br />- Construct extended period simulation distribution system evaluation scenarios <br />- Incorporate logical controls for the existing and future scenarios based on current <br />operations and City input. <br />- Develop physical sets to control the typical set-up and initial settings for each <br />scenario for simplified use. <br />Task 7.2 -Demand Allocation <br />REI will: <br />- Utilize the updated water demand projections to allocate demands for the existing and <br />future scenarios using the WaterCAD v8 allocator module. This Scope presumes that <br />the updated water demands developed by the City are not geolocated. As such, REI <br />will apply a ratio, based on a comparison of the updated water demand projections to <br />the water demands allocated at the parcel level in previous work conducted by REI <br />for the City in 2009, in order to update the water demand allocation for use in this <br />Scope. <br />- Update the Model peaking factors based on the summarized historical water <br />discharge flow meter records, rainfall data, and previous City reports. <br />Data Required: Current operational settings and/or trigger for each high service pump <br />and elevated tank, latest 5 -year historical water treatment plant production data summary <br />Deliverables: <br />♦ Updated water hydraulic model scenarios with updated peaking factors, existing and <br />future demands <br />Page 6 of 14 ( F E. t, visit.zinc <br />
The URL can be used to link to this page
Your browser does not support the video tag.