Laserfiche WebLink
January 11, 2010 <br />Page 2 <br />Letter of Understanding <br />The City has requested that the County sample the following sites as part of the <br />following Lake Jesup BMAP Monitoring plan: <br />Sample Site <br />Frequency <br />Per Sample Cost <br />Annual Cost <br />Gee Creek northeast of Lake <br />Not to exceed 12 <br />$419.50 <br />Not to exceed <br />Kathryn <br />times/year <br />$5,034.00 <br />Lake Howell -HOW <br />Not to exceed 1 <br />$244.50 <br />Not to exceed <br />times/year <br />$244.50 <br />The above sample locations will be collected using FDEP SOP for ambient water quality <br />monitoring by staff (and/or contractors) certified in this type of field work at the <br />frequency listed. Cost details are identified in Appendix A and B, based on the method <br />of sample collection (i.e. grab or watercraft accessed samples). <br />In accordance with Appendix A and B attached hereto, the City will pay Seminole <br />County quarterly for the specified ambient monitoring program. The monitoring costs <br />are subject to change dependent upon the number of samples actually taken (weather <br />dependent) but will not exceed the frequency specified unless authorized by the City. <br />Seminole County will invoice the City quarterly based upon the number of samples <br />collected within that quarter. The above referenced monitoring plan does not include <br />NPDES sampling sites and may be revised during the agreement period to incorporate <br />additional BMAP or NPDES sampling sites that may be added as a result of regulatory <br />and/or permit requirements, based on the schedule of fees on Appendix A or Appendix <br />B. <br />If you have any questions, please feel free to give me a call at (407) 665-5601. <br />Sincerely <br />W. Gary Jon , P.E. <br />Director, Public Works <br />Attachment: Appendix A — Cost Matrix for Grab Samples <br />Appendix B — Cost Matrix for Watercraft and/or Grab Samples <br />Cc: Shannon Wetzel, Principal Environmental Scientist <br />Kim Ornberg, PE, Principal Engineer <br />Accepted by City of Casselberry <br />°q -12 --lo <br />Charlene Glancy yor/Commissioner Date <br />