My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-2013 Authorizing Agreement between HDR, Inc and City of Casselberry for Construction Engineering (Anchord Road)
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2009 Resolutions
>
09-2013 Authorizing Agreement between HDR, Inc and City of Casselberry for Construction Engineering (Anchord Road)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2022 11:14:20 AM
Creation date
8/11/2022 11:11:54 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
2/23/2009
Doc Number
09-2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Mark Gisclar <br />Page 6 <br />February 11, 2009 <br />• Compile the punch list, review with Client and transmit to the Contractor. <br />• Review progress of corrective action on punch list items and periodically update <br />and re -issue. <br />Issue Substantial Completion Punch List <br />• Review the findings of the substantial completion inspection with Client and <br />jointly determine the status of the Work. <br />• Address comments from either Client or the Contractor regarding the tentative <br />date of substantial completion.or the punch list. <br />Review Final Completion Submittal <br />• Receive and review the Contractor's required final completion submittal. <br />• Develop final completion submittal checklist. <br />• Review for completeness and compliance with Contract provisions. <br />• Notify Client and Contractor of date of final inspection. <br />Conduct Final Completion Inspection <br />• Schedule the final inspection date and notify the Contractor and Client. <br />• Assemble the various final completion submittal documents for the final <br />inspection meeting and review them with the various parties. <br />• Conduct the final inspection. <br />Recommend Final Payment <br />• Review final payment application. <br />• Finalize all Project costs and determine the final adjusted amounts for <br />construction. <br />TASK 5.0: ADDITIONAL SERVICES <br />This task will include any services that are not included in Tasks 1. through 4 and would <br />involve additional services beyond this scope of work. Such work includes additional <br />observation, reports, Engineering, meetings or analysis and will be completed only upon <br />the Client's direction. Additional services will be completed on an hourly basis plus <br />reimbursable expenses, according to the attached rate schedule. <br />HDR Engineering, Inc. 315 E Robinson Street Phone: (407) 420-4200 <br />Suite 400 Fax: (4071420-4242 <br />Orlando, FL 32801-1949 wrww.hdrinc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.