My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-2013 Authorizing Agreement between HDR, Inc and City of Casselberry for Construction Engineering (Anchord Road)
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2009 Resolutions
>
09-2013 Authorizing Agreement between HDR, Inc and City of Casselberry for Construction Engineering (Anchord Road)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2022 11:14:20 AM
Creation date
8/11/2022 11:11:54 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
2/23/2009
Doc Number
09-2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Mark Gisclar <br />Page 5 <br />February 11, 2009 <br />TASK 2.0: ADMINISTRATION OF CHANGED WORK <br />• Verify that Contractor completes any change orders negotiated between the <br />Client and the Contractor as provided by the Client. <br />• Verify that the Contractor has completed any field orders as negotiated between <br />the Client.and,the Contractor, as provided by the Client. <br />• Document any known deficiencies of change orders and field orders that are <br />provided by the Client. <br />TASK 3.0: MEASUREMENT AND PAYMENT ADMINISTRATION <br />Consultant Activities: <br />Review and Process Application for Payment <br />• Review draft application for payment. Make notations of deficient work not <br />recommended for payment until corrected. <br />• Return a copy of the reviewed draft to the Contractor. <br />• Conduct review of storage areas and verify existence of invoiced <br />materials/equipment and proper storage. <br />• Meet with Contractor to reconcile discrepancies. <br />• Review revised application for payment. <br />TASK 4.0: PROJECT CLOSEOUT <br />Consultant Activities: <br />Review Substantial Completion Submittal <br />• Receive and review Contractor's required substantial completion submittal and <br />determine if Project is ready for substantial. completion inspection. <br />• Develop substantial completion Submittal checklist. <br />• Review Contractor Record Drawings. <br />• Review substantial completion submittal documents for completeness and <br />compliance with Contract provisions. <br />• Schedule substantial completion inspection. <br />Conduct Substantial Completion Inspection <br />• Notify design team members of date or substantial completion. inspection. <br />• Notify Client's designated representative of the date of the substantial <br />completion inspection. <br />• Prepare and distribute the punch list format to the parties conducting the <br />inspection. <br />HDR Engineering, Inc. 315 E Robinson Street Phone: (407) 420-4200 <br />Suite 400 I Fax: (407) 420-4242 <br />Orlando, FL 32801-1949 www.hdrinc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.