Laserfiche WebLink
Mr. Mark Gisclar <br />Page 4 <br />February 11, 2009 <br />Client Notification of Accident Damage/Injury <br />• Maintain communications with Contractor's superintendent to encourage prompt <br />notification of accidents. <br />• Require lost -time accident reports at construction meetings. <br />• Upon observation or notification of an accident, take photographs and/or <br />videotape of accident scene, make written notes and notify Client. <br />Task Deliverables: <br />• Inspector Daily Field Reports. <br />• Damaged Materials/Equipment Report. <br />• Notice of Non -Compliance with the Intent of the Contract Documents. <br />• Notification of Required Sitework Action. <br />• Photo/video documentation of construction activities. <br />• Salvaged Materials/Equipment Form. <br />• Subgrade Acceptability Certification. <br />• Subgrade Correction Requirement. <br />• Testing Services Visitation Record. <br />• Yard Piping Pressure Test Log. <br />• Maintenance of Traffic Report Form. <br />• Stormwater Pollution Prevention Plan Inspection Report Form. <br />• Written notification of deficiencies in Record Drawings. <br />• Monthly punch list of work and for substantial and final inspection. <br />• Documentation of accident damage/injury. <br />Key Understandings and Assumptions: <br />• Consultant will not supervise, direct or control Contractor's forces. <br />• Consultant's construction observation and inspection will not be exhaustive and <br />is not intended to be sufficient enough to prevent Contractors from failing to <br />perform work in accordance with contract requirements. Consultant will act to <br />have defective work corrected. by the Contractors when Consultant is aware <br />defective work exists. <br />• Consultant will manage a maximum of one construction observers to provide <br />construction observation and verification at the various sites of the Work, and <br />will not be required to assign personnel to this Task to the extent that a . <br />construction observer is present on site at all times a Contractor is working. <br />• Consultant will not provide equipment for or conduct the testing of soils <br />compaction. <br />HDR Engineering, Inc. 1315ERobinsonStreet I Phone: 14071420-4200 <br />Suite 400 Fax: 14071420-4242 <br />Orlando, FL' 32801-1949 wmOdrinc.com <br />