My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 03/20/2019 Minutes - Joint Workshop with PRAB
Laserfiche
>
City Clerk's Public Records
>
Minutes
>
City Commission Minutes
>
City Commission Minutes Archives
>
2019 City Commission Minutes
>
CC 03/20/2019 Minutes - Joint Workshop with PRAB
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 5:08:09 PM
Creation date
1/30/2020 5:08:05 PM
Metadata
Fields
Template:
City Clerk
Meeting Type
Workshop
City Clerk - Doc Type
Minutes
City Clerk - Date
3/20/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CASSELBERRY CITY COMMISSION. <br />Minutes of March 20, 2019 — Joint workshop <br />Page 6 of 8 <br />• Bermuda sod; widen sidewalks <br />■ Replace north pavilion with new 3000 pavilion <br />■ Provide furnishings including grills, trash receptacles, picnic tables <br />o Nature Boardwalk Renovation <br />■ Replace existing boardwalk structure, deck and railing <br />■ New path to playground <br />o Playgound Renovation <br />■ 1/3 of existing playground is being done by City, to be play & pour surface <br />■ Remaining 2/3 mulch replaced by play & pour surface <br />• 2-5 year-old & 5-12 year old age group stand-alone playgrounds <br />■ Upgrade benches to Victor Stanley <br />• Keep existing seat wall <br />■ Shade structure <br />o New Picnic Areas <br />■ Two new picnic areas; one behind Rec Center on patio with shade structure <br />■ One next to passive canoe/kayak launch <br />• ADA access with concrete pad <br />■ New sidewalk connection <br />o Canoe/Kayak Launch Area <br />■ ADA accessible path connection to Rec Center across existing parking area <br />• Secured fenced storage for canoes/kayaks <br />• Concrete pad in the vicinity of the launch area <br />• Redesign launch ramp <br />■ Address swale/pipe hazard at launch ramp <br />o Outdoor Fitness Equipment <br />■ Exercise station to be located northwest of playground area along the trail <br />■ Outdoor exercise equipment to be specified <br />o Miscellaneous Additions <br />■ ADA compliant parking in front of Rec Center <br />■ New restroom by playground (demo old one) slightly larger with storage <br />■ Renovate restroom by Secret Lake pavilion & fishing pier <br />■ Upgrade water fountains and benches <br />■ Address dip in driveway near boat launch <br />■ New pavilion near age 2-5 <br />■ Electrical outlets & pavilion lighting <br />• Landscape buffer along access drive from Ivey Road <br />■ New digital board sign at park entrance <br />Perspective renderings <br />Citizen Comments: The following individuals came forward: <br />1. Mr. Walt Bagley, 614 Doheny Way, suggested that the proposed pavilions should be larger <br />to encourage more usage by the community for events and get-togethers. <br />2. Ms. Jamie Roselius, 470 Lilac Road, inquired about the total number of parking spaces on <br />
The URL can be used to link to this page
Your browser does not support the video tag.