Laserfiche WebLink
Planning & Zoning Commission/ <br />Local Planning Agency Minutes <br />November 14, 2018 <br />Page 5 <br />for the RMF -13 and RMF -20 zoning districts to allow for additional impervious surface. She said staff would be bringing <br />forward legislation in progress to change the size and dimension criteria to allow for a greater impervious surface ratio. <br />Ms. Hanna said staff requests the Planning and Zoning Commission make a recommendation of approval to the City <br />Commission for the proposed Development of Community Impact site plan application for the Azul at Lake Howell (SPR 18- <br />25). She said the recommendation is based on the site plan with a revision date of November 5, 2018, the findings of fact and <br />conclusions of the staff report dated November 14, 2018, and subject to the following conditions: <br />Waiver: <br />1. A waiver to Section 3-15.6 requesting 100% of the parking spaces to be reduced to 9'x18, and the ADA parking <br />spaces to be reduced to 12'x18'. Staff supports this request as it is identical to Integra Lakes and Bainbridge <br />Apartments. Additionally, staff supports the ADA request as the applicant is keeping the required 12' width per <br />ADA and also providing the 5' access to the right of each ADA parking space to allow for ample room and access <br />to the vehicle. The Planning and Zoning Commission has the authority to grant this waiver. <br />Conditions of Approval: <br />1. The approval of the building height exceeding 35 feet in height is dependent on the City Commission <br />approving Legislation in Progress as outlined above, which will require a conditional use. If the City does <br />not adopt the Legislation in Progress and the resulting ordinance, the applicant will need to come back to <br />the Development Review Committee (DRC) with a building height that meets the 35 feet height <br />requirement. <br />2. The approval of the 1.75 parking spaces per dwelling unit is subject to the City Commission's approval of <br />the Legislation in Progress and the subsequent ordinance adopting the 1.75 parking spaces per dwelling <br />unit as the standard for all multi -family developments. If the City does not adopt this ordinance, the <br />applicant will need to come back to the Planning and Zoning Commission and revise the site plan to provide <br />required two (2) parking spaces per dwelling unit. <br />3. The approval of the reduced minimum living area is subject to the City Commission's approval of the <br />Legislation in Progress and the subsequent ordinance adopting the minimum living area as permitted <br />currently in PMX-Mid and PMX-High. If the City does not adopt this ordinance, the applicant will need to <br />come back to the Planning and Zoning Commission and revise the site plan to provide the minimum living <br />area as outlined within the RMF -13 zoning district. <br />4. The approval of the reduction in open space requirement is subject to the City Commission's approval of <br />the Legislation in Progress and the subsequent ordinance adopting an amended impervious surface%pen <br />space (ISR) requirement. If the City does not adopt this ordinance, the applicant will need to come back to <br />the Planning and Zoning Commission and revise the site plan to provide the ISR requirement as outlined <br />within the RMF -13 zoning district <br />5. All Public Works issues and comments must be addressed prior to issuance of a site construction permit. <br />6. The property shall pass landscaping, irrigation, and photometric/lighting inspections prior to completion of <br />the project or issuance of a Certificate of Occupancy. <br />7. Any payment required to be made to the Tree Bank shall be made prior to the issuance of the Certificate of <br />Occupancy. <br />8. All required local, regional, state, and federal permits shall be obtained before commencement of <br />development. <br />9. The site plan approval shall be valid for one (1) year. An extension request may be submitted prior to the <br />expiration of this approval. <br />10. All of the above conditions shall be fully and faithfully executed or the site plan shall become null and void. <br />