My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 01/22/2018 Minutes Workshop
Laserfiche
>
City Clerk's Public Records
>
Minutes
>
City Commission Minutes
>
City Commission Minutes Archives
>
2018 City Commission Minutes
>
CC 01/22/2018 Minutes Workshop
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2018 4:35:16 PM
Creation date
7/25/2018 4:35:08 PM
Metadata
Fields
Template:
City Clerk
Meeting Type
Workshop
City Clerk - Doc Type
Minutes
City Clerk - Date
1/22/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CASSELBERRY CITY COMMISSION <br />Minutes of January 22, 2018 — Workshop <br />Page 5 of 10 <br />also noted that there was a possibility of receiving funding for some of the projects from other sources, <br />including grants, volunteers and corporate partnerships. <br />CONSENSUS: The City Commission agreed by consensus for purposes of discussion to <br />allocate $1.2 million for improvements to Secret Lake Park to include all <br />suggested enhancements shown on the list provided by staff. <br />Park Name: Service Enhancements <br />Estimated Cost: <br />Wirz Park <br />• Improve parking lot landscaping <br />$ <br />3,000.00 <br />• Add benches throughout the park <br />$ <br />8,000.00 <br />• Plant trees along trail loop <br />$ <br />5,000.00 <br />• Add wayfinding, mile marker, and amenity signage <br />$ <br />20,000.00 <br />• install drinking fountains with dog watering bowls <br />$ <br />12,000.00 <br />• Add dugout shade structures <br />$ <br />45,000.00 <br />• Upgrade existing pool/destination splash pad <br />$ <br />100,000.00 <br />• Improve recreation building to be a small community center <br />$ <br />200 000.00. <br />Enhancements Total: <br />$ <br />393,000.00 <br />Discussion: Discussion ensued which included: potential expansion of the recreation building; <br />expansion of existing pool vs. building a new, larger pool; whether a major destination splash pad should <br />be located in Wirz Park or another park; need for more realistic estimates for construction of proposed <br />enhancements, including a splash pad and new pool; whether to continue to dedicate space and <br />maintenance of ballfields for Little League play and the need for community input as to what is desired <br />as far as sports fields; issues with Little League participation vs. Babe Ruth and options for play in <br />surrounding area; current utilization of pool and whether existing pool would meet future needs; <br />feasibility of utilizing space currently used for ballfields for construction of a larger pool and destination <br />splash pad; feasibility of moving ballfields to another park since they are currently underutilized; whether <br />interest is trending more towards soccer than baseball and softball; concerns about displacement of kids <br />who play Little League due to jurisdictional boundaries and capacities if ballfields are eliminated and <br />how it would affect the community; and concerns about completely eliminating the ballfields based on <br />future planning information contained in the Master Plan. <br />CONSENSUS: The City Commission agreed by consensus for the purposes of discussion to <br />allocate $1.5 million for a water feature park to include an Olympic size <br />pool and splash pad and upgrades to the small community/recreation <br />center in addition to the overall improvements contained in the list, with <br />specific details to be determined later. <br />
The URL can be used to link to this page
Your browser does not support the video tag.