My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 01/22/2018 Minutes Workshop
Laserfiche
>
City Clerk's Public Records
>
Minutes
>
City Commission Minutes
>
City Commission Minutes Archives
>
2018 City Commission Minutes
>
CC 01/22/2018 Minutes Workshop
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2018 4:35:16 PM
Creation date
7/25/2018 4:35:08 PM
Metadata
Fields
Template:
City Clerk
Meeting Type
Workshop
City Clerk - Doc Type
Minutes
City Clerk - Date
1/22/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CASSGLBERRY CITY COMMISSION <br />Minutes of January 22, 2018 — workshop <br />Page 6 of 10 <br />Park Name: <br />Dew Drop Park <br />• *Re -Master Plan and evaluate stormwater issues <br />• Improve entrance road and parking hardscape areas <br />• Improve parking lot and perimeter planting areas on east side <br />• Accessible playground <br />• Upgrade entrance and wayfinding signage <br />• Large pavilion <br />• Add shade shelters throughout park <br />• Small pavilion <br />• Install outdoor exercise equipment along walkway <br />• Replace/upgrade the existing restroom facility <br />• Install additional site amenities and drinking fountains <br />• Fishing pier & overlook <br />Enhancements Total <br />Service Enhancements <br />Estimated Cost: <br />$ 100,000.00 <br />$ 150,000.00 <br />$ 60,000.00 <br />$ 150,000.00 <br />$ 28,000.00 <br />$ 65,000.00 <br />$ 15,000.00 <br />$ 35,000.00 <br />$ 24,000.00 <br />$ 80,000.00 <br />$ 30,000.00 <br />$175,000.00 <br />$ 912,000.00 <br />Discussion: Discussion ensued with input from Public Works Director Mark Gisclar and Recreation <br />Manager Linda Moore regarding the suggested enhancements, including: issues with the layout of the <br />park and access to the park, and deficiencies in equipment and amenities; lack of parking and sidewalks, <br />and hidden nature of the park leading to its being susceptible to vandalism; need for ADA (Americans <br />with Disabilities Act) compliance; frequent utilization of the park by both city residents and non -city <br />residents; potential for the park to be developed into a really nice 7 -acre lakefront neighborhood park; <br />need for the park to be re -master planned in order to become a truly functioning park; stormwater issues; <br />safety issues; possible land acquisition to open up ingress and egress; and options for improvements, <br />better maintenance and security for the park. <br />CONSENSUS: The City Commission agreed by consensus for purposes of discussion to <br />allocate $500,000 to make improvements to the park, not to include <br />improvements which would attract vandalism, and to revisit the <br />feasibility of additional enhancements at a later time. <br />Park Name: <br />Forest Brook Park (Undeveloped) <br />Service Enhancements <br />Estimated Cost: <br />
The URL can be used to link to this page
Your browser does not support the video tag.