My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 10/26/2015 Minutes
Laserfiche
>
City Clerk's Public Records
>
Minutes
>
City Commission Minutes
>
City Commission Minutes Archives
>
2015 City Commission Minutes
>
CC 10/26/2015 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2016 2:24:00 PM
Creation date
3/2/2016 2:23:46 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Minutes
City Clerk - Date
3/2/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CASSELBERRY CITY COMMISSION <br />Minutes of October 26, 2015 — Regular Meeting <br />Page 11 of 16 <br />MOTION: Commissioner Hufford moved to approve Ordinance 15 -1431 on first reading, <br />as presented. Motion was seconded by Commissioner Aramendia. Motion <br />carried unanimously by voice vote 5 -0. <br />i <br />No items were presented for consideration on this agenda. <br />12. OTHER ITEMS <br />A. Casselton Drive Improvements Project Presentation and Discussion <br />Staff Presentation: Assistant Public Works Director /City Engineer Kelly Brock gave a PowerPoint <br />presentation on the preliminary plan for the Casselton Drive Improvements Project which included the <br />following components: <br />Project Objectives <br />Stormwater: Repair/replace major storm pipe trunk line; other drainage <br />improvements as feasible <br />Water Utility Improvements: Replace major water main <br />Roadway Rehabilitation & Improvements: Resurface road and construct "complete <br />street" improvements <br />Preliminary Plan <br />Narrows Casselton Dr (to Greencastle Blvd) <br />Reduces on- street parking and designates specific locations <br />Fills in sidewalk gaps /replaces sidewalk <br />Adds "park" and stormwater treatment areas to west side <br />Dr. Brock explained that the current preliminary plan did not depict all the specific features such as exact <br />stormwater, park and landscaping features, pedestrian crosswalks & striping details, or finalized sidewalk size <br />and alignment; however those would all be included in the final plan and he was seeking input and a consensus <br />from the Commission on several of the key elements. He then advised that staff was currently recommending <br />the following: <br />- Narrowing Casselton Drive fi•om its current width of approximately 55 ft. to the more typical <br />24 ft. width; <br />- Reducing on- street parking which is currently on the west side and moving the parking to the <br />east side; <br />- Filling in sidewalk gaps; <br />- Increasing the stormwater treatment area and creating a linear park. <br />
The URL can be used to link to this page
Your browser does not support the video tag.