My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC Minutes 10/08/2012
Laserfiche
>
City Clerk's Public Records
>
Minutes
>
City Commission Minutes
>
City Commission Minutes Archives
>
2012 City Commission Minutes
>
CC Minutes 10/08/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2013 1:24:13 PM
Creation date
3/22/2013 1:23:57 PM
Metadata
Fields
Template:
City Clerk
Meeting Type
Regular
City Clerk - Doc Type
Minutes
City Clerk - Date
10/8/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CASSELBERRY CITY COMMISSION <br />Minutes of October 8, 2012 — Regular Meeting <br />Page 5 of 14 <br />Miscellaneous Storm Drain Components Rehabilitation and includes the additional components detailed in <br />Budget Amendment 13 -001. Including the Budget Amendment, the following Stormwater Utility Fund <br />amounts will be available for costs associated with this project (all within Account 110- 0740 - 539.63 -40): <br />FY 2011 -12 Line Items (Available Pending Budget Rollover Planned for December 2012) <br />$158, 000 — Line Overbrook /S Triplet Lake Drive System <br />$30, 000 — Line Mark David Storm Crossing <br />$40, 000 — Line Lancelot Storru Pipe (at Roundtable) <br />FY 2012 -13 Line Items (Currently Available) <br />$170, 000 — Line Timberlane /Osceola Trail System <br />$76,500 —Line Woodstream System <br />$37,600 — Line Surrey Run / Sundown ,System <br />$64,900 — Line Turtle Mound System to Wolf Trail <br />$135, 000 — Line Bridle Path System <br />$79,800 — Line Micanopy to Turtle MoZnzd <br />$50, 000 — Line Gee Creek Lane System <br />Budget Amendment No. 13 -001 Line Item (Proposed) <br />$275,000 — Miscellaneous Storm Drain Components rehabilitation <br />$1,116,800 — TOTAL <br />It is anticipated that, with the above line items, there will be sufficient remaining combined funding to cover <br />construction. However, a future budget amendment may be necessary should construction costs exceed initial <br />estimates; this will be considered at the time of bid award. For tracking purposes, this is part of Project PW <br />91219 2012 -2013 Storm Drain Rehabilitation. <br />BA #13 -001: <br />Explanation of Request: This item seeks City Commission approval to provide additional funding for design <br />costs and added areas associated with Miscellaneous Storru Drain Components Rehabilitation related to the <br />ProiectPW 1219 "2012 -2013 Storru Drain Rehabilitation Project". Specifically, this amendment allocates <br />funding to include previously unbudgeted components of this project proposed for rehabilitation/retrofit. The <br />following projects will be included in this contract with CDM Smith to utilize cost savings: Marls David <br />Boulevard, Wolf Trail and Gee Creek Lane vicinity filter baskets, Wolf Trail to Gee Creek outfall channel, <br />Secret Way, Sundown trail system, additional storm pipe rehabilitation along Osceola Trail, and City Hall <br />parking lot manhole rehabilitation. The remainder of the projects included in this contract have been fully <br />funded in the FY2012 (to be included as a rollover item which will be presented for separate consideration) <br />and FY2013 budgets. <br />Recommendation: The City Manager and the Public Works Director recommended approval of Resolution <br />12 -2417 and related Budget Amendment #13 -001. <br />
The URL can be used to link to this page
Your browser does not support the video tag.