Laserfiche WebLink
Planning & Zoning Commissionl <br />Local Planning Agency <br />November 10, 2010 <br />Page 3 <br />relocated to the parent parcel and a new sign would be constructed for the retail structure. He said both signs would <br />require a permit and staff would review the proposed signage to ensure that it is consistent with the Unified Land <br />Development Regulations. <br />Mr. Raasch stated should the Planning and Zoning Commission choose to approve SPR 10-15 for proposed <br />redevelopment of the future outparcel located at 1870 State Road 436, the approval would be based upon the site <br />plan dated October 1, 2010 the findings of fact and conclusions of the staff report dated November 5, 2010 and the <br />following conditions: <br />1. Approval of the following site plan modification requests: <br />® ULDR Section 2-5.4, Table 2-5.4, Size and dimension requirements: The front setback on <br />Greencastle Boulevard may be reduced to 10' through the use of a 4-hour fire wall, as specified in <br />ULDR Table 2-5.4 footnote J. <br />® ULDR Section 3-15.2, Parking spaces required by use: The amount of required parking for the site <br />may be reduced from 15 to 14 parking spaces. <br />2, The applicant will submit a revised version of the site plan with the following corrections: <br />® Cover Sheet: Modification request number one will be revised to read "2-5.4" instead of"2-5.3" <br />® L-101: The four trees on the west side of the parking area will be revised to "LI" instead of "QV" <br />® L-102: The Live Oak trees will be reflected in diameter at breast height (DBH) instead of caliper <br />3. The proposed project requires a re-plat. The applicant must initiate plat review and receive preliminary <br />plat approval from the City Commission prior to the approval of any site or building permits unless <br />otherwise specified by the City Engineer. Final plat approval shall be obtained prior to issuance of a <br />Certificate of Occupancy. <br />4. The preliminary and final plat must reflect the required cross access, joint parking, stormwater retention <br />and utility easement agreements between the applicant and the adjacent property owner. <br />5. The building plans will be reviewed by the City's contracted Building Official prior to building permit <br />issuance. <br />6. All signage for the site shall conform to the City's Unified Land Development Regulations. All proposed <br />signage shall be submitted as a separate building permit. <br />7. All proposed and future equipment shall comply with the decibel levels as stated in Chapter III, Article <br />XVII, Section 3-17,4(G) of the Land Development Regulations <br />8. All rooftop equipment shall be screened from view. Trash dumpsters and other equipment shall be <br />screened from view and kept in a neat and orderly appearance. <br />9. No outdoor storage of goods and materials shall be permitted; nor shall outdoor displays be permitted. <br />10. No site engineering construction activities shall take place at the site until permits are issued by the <br />City's Public Works Department. <br />11. Any outstanding comments from the City's Fire Department shall be addressed prior to the issuance of <br />a building permit. <br />12. All permits from appropriate State and County agencies shall be obtained prior to the submittal for a site <br />engineering permit to the City's Public Works Department. <br />13. The property shall pass landscaping, irrigation, and photometric/lighting inspections prior to completion <br />of the project or issuance of a Certificate of Occupancy. <br />14. The site plan approval shall be valid for one year upon approval by the Planning and Zoning <br />Commission. An extension request may be submitted prior to the expiration of this approval, <br />