My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-1697 Design Services for Segments 1 & 3 of Casselberry Bike Trail & Master Plan Update
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2006 Resolutions
>
06-1697 Design Services for Segments 1 & 3 of Casselberry Bike Trail & Master Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2010 11:34:24 AM
Creation date
8/3/2010 11:32:08 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
8/14/2006
Doc Number
06-1697
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2.~ [3ase Sheet Preparation -Glatting Jackson shall develop a site base plan based on <br />survey data that will include boundary, topographic, utility, tree and adjacent land use <br />data far the project site. Base plans shall be of sufficient detail to provide design <br />services for the proposed project. <br />~.~ Conceptual Master Plan -Based on the results of the design review, Glatting <br />Jackson will prepare a Conceptual Master Plan for Trail Segments One and Three for <br />the Client's review. Elements of the conceptual plan will include the follo~i~ing: <br />A. Proposed U~ail alignment <br />B. Location of potential trailhead facilities including parking and amenities <br />C. Intersection and road crossin~~s <br />D. Trail connections to adjacent and nearby city properties <br />E. Site amenities and furnishings <br />F. Conceptual Storm water facilities <br />~.6 Design De~~eloprnent Plans -Based on the approved Conceptual Master Plan. <br />Glatting Jackson shall develop preliminary design of the proposed improvements and <br />renovations. Preliminary plans shall include the following: <br />1 . Site Preparation plans (Civil Engineer) <br />?. Layout and hardscape construction plans and details (Glatting Jackson. Civil <br />Engineer) <br />3. Grading and draina~~e plans and details (Civil Engineer) <br />~. Signing and marking plans (Glatting Jackson) <br />>. Landscape plans (Glatting Jackson) <br />Submittals to the Client will be at sixty percent (60%) and ninety percent (90%) <br />completion intervals for reyie~~~. With the ninet•~ percent (90%) dra~~ing submittal. <br />Glattin~~ Jackson ~~-ill prepare and submit draft technical specitications for pertinent <br />Division ~ throu~~h Division 16 sections. The Client will be responsible for Di~~ision <br />1 specitications (front-end documents). <br />2.7 Final Construction Documents -Based on the ClienCs comments from the ninety <br />percent (90%) review, Glatting Jackson shall prepare Final Construction Documents <br />and technical specifications. <br />?.8 Statement of Construction Costs -Along with the preparation of the sixty percent <br />(60%) design development plans, Glatting Jackson will prepare a preliminary <br />statement of construction costs. This will be used for evaluation of project costs <br />~~,~nrrm Une /roil Uc°si;~t l)creln~~nien! Glatting Jackson Kercher,'inglin Lopez Rinchan <br />( ~~h nl (~ussc~/h~'rr~ 3 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.