Laserfiche WebLink
<br />C. The ENGINEER will prepare the Operations and Maintenance Performance <br />Report (OMPR) to include the following work: <br /> <br />1. Perform a site visit with City staff to inspect the current condition of the <br />wastewater facility. <br /> <br />2. Prepare an OMPR based on FDEP's Guidelines for Preparation of <br />Operation and Maintenance Performance Reports. The OMPR will <br />describe in detail each component of the facility and state the current <br />condition of each. The OMPR will include a statement identifying if the <br />facility is capable of providing proper treatment for the next five (5) years, <br />or recommending any necessary repairs and revisions to ensure it will <br />operate sufficiently for the next five (5) years. <br /> <br />D. The ENGINEER will review and revise the Operating Protocol, as necessary, <br />in accordance with FDEP requirements, which includes the following items: <br /> <br />1. Review procedures and criteria outlined in the current operating protocol <br />to ensure compliance with FDEP requirements and permit conditions <br />under both normal and adverse weather conditions. <br /> <br />2. Evaluate effectiveness of procedures and criteria noted above and <br />including assessing any violations of the permit requirements and <br />conditions of the existing operating permit. <br /> <br />3. Provide analysis and correlation of parameters sampled and test by the <br />laboratory to continuously monitored parameters such a turbidity and total <br />chlorine residual. <br /> <br />4. Revise Operating Protocol to include any proposed or necessary changes <br />to be reviewed and approved by the FDEP. <br /> <br />E. The ENGINEER shall prepare necessary information and documents related <br />to permitting supplemental water supplies to augment the City's existing <br />permitted public access reuse system during peak demand periods. <br />Descriptions of the proposed supplemental water supplies are as follows: <br /> <br />1. Ground water: The City proposes to equip and connect an existing eight <br />(8) inch City well to the City's public access reuse distribution system. <br />This well was a former potable water well. <br /> <br />2. Orinkinq water: The City proposes to extend a water main to the <br />reclaimed water storage tank to augment tank levels as needed. An air <br />gap will be provided equal to at least two times the diameter of the fill <br />pipe. <br /> <br />3 <br />