<br />CDM <br /> <br />Scope of Work <br /> <br />relocated it to the west side of Lake Concord as per direction of the CITY where the <br />fountain equipment already exists. <br /> <br />Subtask 3.5 - Pull Box/Water Feature C01ltrol Pa1leVLP-2 Placeme1lt <br />The ENGINEER will re-design the configuration for the amphitheatre pull box, <br />interactive water feature control panel, and LP-2 in the vicinity of the interactive <br />water feature currently shown on the 90 percent design drawings. The interactive <br />water feature (being designed by others) currently calls for the installation of a <br />subterranean equipment vault measuring 96"x72"x72". The ENGINEER will re- <br />design the configuration of these three items such that they are pulled closer together <br />as well as design for conflicts due to the large size of the vault for the interactive <br />water feature. <br /> <br />Sub task 3.6 Receptacles Re-Design <br />The ENGINEER will modify the receptacle layout as per the CITY's request to meet a <br />minimum of 30-foot spacing as well as adding three receptacles spaced 50 to 60 feet <br />apart on the outside of the sidewalk ring (sculpture garden area). <br /> <br />Task 4 - Structural <br /> <br />Subtask 4.1 - Retaining Wall Desig1l <br />The ENGINEER will design the retaining wall associated with the stage area and the <br />dry detention pond. The 90 percent drawings previously specified FDOT gravity wall <br />for the dry detention pond but the CITY requests use of decorative split-face block. <br />Design of a retaining wall for the stage area was previously not included in the <br />original scope of services dated September 24, 2007. Cascading block will be called <br />out in the design drawings for the stage area. <br /> <br />Subtask 4.2 - Boardwalk Re-Design <br />The ENGINEER will re-design portions of the boardwalk such that the 300-foot semi- <br />oval boardwalk loop behind the amphitheatre is removed. The ENGINEER will <br />reconfigure the remaining boardwalk at its access from the south shore as needed to <br />reflect this as well as to ensure the design maintains ADA compliance. Railing for the <br />boardwalk will be black powder coated commercial grade aluminum picket rail <br />(straight). <br /> <br />Subtask 4.3 - Stage Re-Desigll . <br />The ENGINEER will revise the design of the stage to a sem!-oval shape, so that the <br />current stage dimensions would be inscribed within the semi-oval. The design will <br />call for a concrete paver/brick paver surface (concrete pavers as bid alternate) as well <br />as decorative black rail at lake's edge. The stage area will be re-designed such that <br />there is a smooth transition into the sidewalk so that it doubles as a lake overlook for <br />pedestrians. The ENGINEER will re-design the stage area such that is supports <br />vehicular loads and temporary stages. A vertical structure over the stage will no <br />longer be included as part of the design. <br /> <br />S:IOOOOlBWMNBICasselberrylScopeaM Budgel!.SCOPe_OaSepOa.docx <br /> <br />3 <br />