<br />Scope of Worl< <br /> <br />will be prepared. The ENGINEER will perform calculations to verify that the weir <br />will be stable against the force of the groundwater table, side banks, and water in the <br />channel. <br /> <br />Task 2 - Final Engineering Design Evaluation <br /> <br />Subtask 2.1 - Hydrologic and Hydraulic Evaluation <br />The ENGINEER will utilize the existing hydrologic/hydraulic Interconnected <br />Channel and Pond Routing (ICPR) model, (Version 2.2) previously developed for the <br />Gee Creek Basin (Singhofen & Associates, Inc. 1996) available from Seminole County. <br />The model will be updated to reflect the current topographic data and will be used to <br />support the proposed design. The proposed conditions model will become the basis <br />for final hydraulic design. The ENGINEER will simulate the mean annual, 25-, and <br />100-year, 24-hour design storm events for both the existing and proposed project <br />conditions. The model results will be used as the supporting documentation for the <br />permit application package. The existing ICPR model is characterized by some <br />instability. If possible, the model will be used to check for erosive velocities in the <br />channel immediately upstream and downstream of the weir. CDM will not correct <br />the instabilities in the existing ICPR model. <br /> <br />Task 3 - Design Services <br /> <br />The ENGINEER will prepare Drawings in general conformance with FDOT <br />Specifications and Design Standards suitable for bidding and construction of all <br />improvements presented on Figure 1. It has been anticipated that there will be <br />approximately 10 general/ civil/ structural/ geotechnical construction plan sheets. It <br />has been assumed for budgeting purposes that the civil design will include; weir <br />design, channel stabilization and grading, and sheet pile design. There will also be a <br />structural design component for the weir and weir foundation will be provided under <br />this work authorization. Structural design will be in compliance with FOOT design <br />criteria for drainage structures. <br /> <br />Subtask 3.1 - Construction Documents <br />The design effort will include two submittal milestones corresponding to 90%, and <br />100% complete. The ENGINEER shall use CITY supplied Division 0 and Division 1 <br />specifications and FOOT standard specifications. CDM will develop technical <br />specifications and special provisions for items not covered by FDOT specifications. <br />The ENGINEER shall provide four sets of full size plans (22-inch x 34-inch) and <br />specifications and a bid tab with quantities, for review and comment by the CITY at <br />the 90 percent milestone. For the 100 percent milestone, the ENGINEER will submit <br />four sets of full size plans bound, specifications, bid tab, and one compact disk (CD) <br />containing electronic files of the documents in PDF format following. Review <br />comments received from the CITY will be incorporated into the construction <br />documents (plans and specifications) as mutually agreed upon by the CITY and the <br />ENGINEER. <br /> <br />A <br /> <br />2 <br /> <br />C:'Dol::umenIs ,.-1 SetlingsWlarres\Loal1 Setli.\TempOl1I11Y IntemeI RIrIsICllK8\Scop12 (4).da(: <br />