My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-1495 Sta. 21 Traffic Signal
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2004 Resolutions
>
04-1495 Sta. 21 Traffic Signal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2005 2:54:26 PM
Creation date
6/2/2004 3:49:44 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
5/10/2004
Doc Number
04-1495
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APR, 6, 2004 1:25PM Traffic Control Devices, Inc, N0.7947 P, 2/6 <br /> <br />0 <br /> <br />TRAFFIC <br /> CONTROL <br /> DEVICES, INC. <br /> <br /> P.O, BOXl$0418 <br />ALTAMONTE SPRINGS, FLORIDA 3271 <br /> <br /> (407) 869-5300 <br /> <br />To: City of Casselberry <br />ARm Ms, Phyllis Wallace <br /> <br />PROI~0SAL <br /> <br />Seminole County Contract A/B.302101/GG <br />Fire Station #21; Seminola Blvd. <br />Traffic Signal Installation <br /> <br />Wc propose to furnish all necessary material, labor, supervision, and tools required to perform <br />the items of work depicted on the attached "Proposal Supplement", more generally described <br />as follows: Installation of Traffic Signal. <br /> <br />Alt work preformed shall be in accordance with the plans and specifications of the Seminole <br />County Comract A/B-302101/GG. <br /> <br />For the sum of One Hundred Twenty Five Thousand Eight Hundred One 8:63/100 Dollars. <br /> ($125,801.63) <br /> <br />IX] This proposal is a unit price proposal. The above referenced sum is an approximate sum <br /> based on the estimated quantities on the attached "Proposal Supplement" (which is an <br /> integral part of this proposal) at the unit prices depicted thereon. The final contract amount <br /> of any contract resulting from this proposal shall be based on the quantities actually <br /> installed and field verified by the Owner's architect/engineer at these unit prices. <br /> <br />All work is guaranteed to be installed in accordance with the latest applicable Code <br />regulations, and to be free from mechanical and electrical defects for one year from the date <br />of acceptance. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.