My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-1480 TEI, Inc. Supplement #2
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2004 Resolutions
>
04-1480 TEI, Inc. Supplement #2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2005 2:54:23 PM
Creation date
6/2/2004 12:12:04 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
2/23/2004
Doc Number
04-1480
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Southeastern Survey & Mapping Corporation (Southeastern) Work Effort <br /> <br />Southeastern will provide limited topographic survey including location of edges of <br />pavement and trailers south of Gee Creek. Southeastern will perform a boundary <br />survey and establish existing right-of-way lines and property lines. Southeastern will <br />locate the wetland lines on the south side of Gee Creek and provide several cross <br />sections of the creek at the historic Belle Avenue crossing. After the alignment is <br />defined, Southeastern will establish and monument the corridor and prepare up to four <br />legal descriptions and sketches. <br /> <br />Lotspeich and Associates, Inc.(Lotspeich) Work Effort <br /> <br />Lotspeich will locate the wetland lines along the south side of Gee Creek in the vicinity <br />of the proposed realignment. The wetland lines on the north side of the creek will be <br />located and surveyed under a separate project <br /> <br />The estimated level of effort for this project is shown on Table 1, attached. <br /> <br />Schedule <br /> <br />TEl will provide a detailed schedule after Notice to Proceed. In general, the schedule is <br />based on the following timeline. The timeline assumes receipt of all survey elements for <br />this work order and the section north of Gee Creek which is being surveyed under a <br />separate contract by the City. <br /> <br />Notice to Proceed <br /> Receipt of Survey <br /> 50% Submittal <br /> City Review <br /> Final Submittal <br /> <br />4 Weeks <br />2 Weeks <br />1 Week <br />2 Weeks <br /> <br />Receivables <br /> <br />TEl will furnish six (6) sets of plans for the Alignment. At completion, TEl will furnish <br />one (1) set of reproducible prints as well as an electronic copy. All documents prepared <br />or obtained by TEl shall be property of the City. <br /> <br />SECTION 3 <br /> <br />SUPPLEMENTARY SERVICES OF THE ENGINEER <br /> <br />If authorized by the OWNER, the ENGINEER shall furnish or obtain from others, <br />supplementary services of the following types which will be paid for by the <br />OWNER as an additional cost as outlined in Section 5; additional services due to <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.