Laserfiche WebLink
<br />City Commission Meeting <br />December 11, 2006 <br />Page 5 <br /> <br />BURSTING WITH MURPHY PIPELINE CONTRACTORS, INC. (MPC); PROVIDING FOR <br />CONFLICTS, SEVERABILITY, AND EFFECTIVE DATE." <br /> <br />Staff Presentation: Resolution 06- I 738 approves a contract with Murphy Pipeline Contractors, Inc. for the <br />replacement of the potable water main located at the intersection of Triplet Lake Drive and Melody Lane and <br />proceeding to the west along Triplet Lake Drive to U.S. 17-92, which is more than thirty (30) years old. The <br />contract price with Murphy Pipeline is $58,000 for the "bursting" of 725 liner feet of 6" asbestos cement <br />water main pipe to 10" polyethylene pipe. The substantial capital investment associated with the upcoming <br />Triplet Lake Drive project ($3.6 M), necessitates the subsurface infrastructure be upgraded to an acceptable <br />condition. <br /> <br />Staff Recommendation: Approval of Resolution 06-1738 as submitted. <br /> <br />Audience In nut: Mr. John Casselberry, 700 S. Lost Lake Lane, Casselberry, Florida, stated that soil testing <br />should be done before the beginning of the project. <br /> <br />MOTION: <br /> <br />Moved by Commissioner Colleen S. Hufford to approve Resolution 06-1738, <br />Contract with Murphy Pipeline Contractors, Inc. for water main replacement, <br />as presented. Motion was seconded by Commissioner Susan Doerner and <br />carried on a 5 - 0 vote. <br /> <br />C. Resolution 06-1739- Agreement with American Water Services Underground Infrastructure for Pipe <br />Lining of Storm Sewer Pipes on Lancelot Way and Bridle Path ($50,736) <br /> <br />The City Clerk read Resolution 06-1739 by title as follows: <br /> <br />"A RESOLUTION OF THE CITY OF CASSELBERRY. FLORIDA, AUTHORIZING <br />THE EXECUTION OF A PROPOSAL FOR STORM SEWER PIPE LINING WITH <br />AMERICAN WATER SERVICES UNDERGROUND INFRASTRUCTURE, INC.; <br />PROVIDING FOR CONFLICTS, SEVERABILITY, AND EFFECTNE DATE." <br /> <br />Staff Presentation: Resolution 06-1739 approves a contract with American Water Services Underground <br />Infrastructure for pipe lining of storm sewer pipes on Lancelot Way and Bridle Path. This project is <br />necessary due to the age of the lines, physical condition and excessive joint separations, which create <br />depressions on roadways and lor lawns. The cost for "lining" of 504 liner feet of storm sewer pipes ranging <br />in size from 18"" to 24" is $50,736. <br /> <br />Staff Recommendation: Approval of Resolution 06-1739 as presented. <br /> <br />MOTION: <br /> <br />Moved by Commissioner Susan Doerner to approve Resolution 06-1739, <br />Agreement with American Water Services for storm sewer pipe lining, as <br />presented. Motion was seconded by Commissioner Colleen S. Hufford and <br />carried on a 5 - 0 vote. <br />