My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC Minutes 12/11/2006
Laserfiche
>
City Clerk's Public Records
>
Minutes
>
City Commission Minutes
>
City Commission Minutes Archives
>
2006 City Commission Minutes
>
CC Minutes 12/11/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2007 5:39:20 PM
Creation date
2/1/2007 5:39:20 PM
Metadata
Fields
Template:
City Clerk
Meeting Type
Regular
City Clerk - Doc Type
Minutes
City Clerk - Date
12/11/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />City Commission Meeting <br />December 11, 2006 <br />Page 5 <br /> <br />BURSTING WITH MURPHY PIPELINE CONTRACTORS, INC. (MPC); PROVIDING FOR <br />CONFLICTS, SEVERABILITY, AND EFFECTIVE DATE." <br /> <br />Staff Presentation: Resolution 06- I 738 approves a contract with Murphy Pipeline Contractors, Inc. for the <br />replacement of the potable water main located at the intersection of Triplet Lake Drive and Melody Lane and <br />proceeding to the west along Triplet Lake Drive to U.S. 17-92, which is more than thirty (30) years old. The <br />contract price with Murphy Pipeline is $58,000 for the "bursting" of 725 liner feet of 6" asbestos cement <br />water main pipe to 10" polyethylene pipe. The substantial capital investment associated with the upcoming <br />Triplet Lake Drive project ($3.6 M), necessitates the subsurface infrastructure be upgraded to an acceptable <br />condition. <br /> <br />Staff Recommendation: Approval of Resolution 06-1738 as submitted. <br /> <br />Audience In nut: Mr. John Casselberry, 700 S. Lost Lake Lane, Casselberry, Florida, stated that soil testing <br />should be done before the beginning of the project. <br /> <br />MOTION: <br /> <br />Moved by Commissioner Colleen S. Hufford to approve Resolution 06-1738, <br />Contract with Murphy Pipeline Contractors, Inc. for water main replacement, <br />as presented. Motion was seconded by Commissioner Susan Doerner and <br />carried on a 5 - 0 vote. <br /> <br />C. Resolution 06-1739- Agreement with American Water Services Underground Infrastructure for Pipe <br />Lining of Storm Sewer Pipes on Lancelot Way and Bridle Path ($50,736) <br /> <br />The City Clerk read Resolution 06-1739 by title as follows: <br /> <br />"A RESOLUTION OF THE CITY OF CASSELBERRY. FLORIDA, AUTHORIZING <br />THE EXECUTION OF A PROPOSAL FOR STORM SEWER PIPE LINING WITH <br />AMERICAN WATER SERVICES UNDERGROUND INFRASTRUCTURE, INC.; <br />PROVIDING FOR CONFLICTS, SEVERABILITY, AND EFFECTNE DATE." <br /> <br />Staff Presentation: Resolution 06-1739 approves a contract with American Water Services Underground <br />Infrastructure for pipe lining of storm sewer pipes on Lancelot Way and Bridle Path. This project is <br />necessary due to the age of the lines, physical condition and excessive joint separations, which create <br />depressions on roadways and lor lawns. The cost for "lining" of 504 liner feet of storm sewer pipes ranging <br />in size from 18"" to 24" is $50,736. <br /> <br />Staff Recommendation: Approval of Resolution 06-1739 as presented. <br /> <br />MOTION: <br /> <br />Moved by Commissioner Susan Doerner to approve Resolution 06-1739, <br />Agreement with American Water Services for storm sewer pipe lining, as <br />presented. Motion was seconded by Commissioner Colleen S. Hufford and <br />carried on a 5 - 0 vote. <br />
The URL can be used to link to this page
Your browser does not support the video tag.