My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-1626 TEI Amendment No. 1
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2005 Resolutions
>
05-1626 TEI Amendment No. 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2005 9:09:59 AM
Creation date
11/3/2005 9:03:06 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
10/10/2005
Doc Number
05-1626
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SECTION 1 <br /> <br />PURPOSE OF AMENDMENT <br /> <br />1.0 General <br /> <br />The purpose of this Amendment is to provide for additional services for the proposed <br />realignment plan for Triplet Lake Drive through the Target parking lot and City <br />properties to align with Melody Lane west of U.S. Highway 17-92. The anticipated work <br />effort is described as follows. <br /> <br />SECTION 2 <br /> <br />SCOPE OF PROFESSIONAL TRANSPORTATION ENGINEERING <br />RELATED SERVICES <br /> <br />2.0 General Services of the Engineer <br /> <br />Provide additional survey and engineering design for construction of additional <br />stormwater retention ponds and infiltration basins west of Highway 17-92, retrofit of the <br />Target parking lot to minimize loss of spaces, design of pond retaining walls and <br />landscape design services. Additional survey and subsoil exploration will be required <br />by these additional design elements. <br /> <br />2.01 General Scope of Services <br /> <br />See descriptions of Tasks 1 through 8 on attached Exhibit A. <br /> <br />2.02 Schedule <br /> <br />After approval of Supplement NO.3: <br /> <br />· Receipt of survey and geotechnical survey - November 22, 2005 <br />· 60% Submittal - January 10, 2006 - (Includes drainage system, ponds, <br />signing and marking, signals, wall design structures, permit submittal, <br />landscape design) <br />· 90% Submittal - February 28, 2006 (Includes above and quantities, cost <br />estimate, final structures) <br />· 100% Submlttal- April 4, 2006 (Includes all components) <br />· Final Submittal - May 2, 2006. <br />
The URL can be used to link to this page
Your browser does not support the video tag.