My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-1626 TEI Amendment No. 1
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2005 Resolutions
>
05-1626 TEI Amendment No. 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2005 9:09:59 AM
Creation date
11/3/2005 9:03:06 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
10/10/2005
Doc Number
05-1626
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />HNTB <br />Proposal File No. 05-60-364 <br /> <br />-2- <br /> <br />The SPT borings will be drilled using a procedure similar 10 the Standard Penetration Test outlined <br />in ASTM D 1586. The borings will be sampled at 18-lnch intervals to 10 feet deep and at 5-foot <br />intervals below 10 feet. Each sample will be removed from the sampler In the field and then <br />examined and visually classified by our crew chief. Representative portions will be sealed and <br />packaged for transportation to our laboratory for further analysis as required. Water level <br />observations will be made In the boreholes during the drilling operation. <br /> <br />We recommend that the project surveyor locate our borings horizontally and vertically (i.e.; <br />determine the elevation of the ground surface at the boring locations). This information will <br />increase the accuracy of the data obtained and will be especially useful in estimating the normal <br />seasonal high groundwater table. We assume that the surveyor will be retained by the client to <br />provide these services. <br /> <br />LABORATORY PROGRAM <br /> <br />Routine laboratory visual classification will be performed along with specific classification tests <br />deemed necessary (I.e., sieve analysis and organic contenls). <br /> <br />ENGINEERING ANALYSIS AND REPORT <br /> <br />Engineering analysis of all data obtained will be made to further evaluate the general subsurface <br />conditions and to develop engineering recommendations to guide site preparation and foundation <br />support for the roadway. In addition, we will provide an estimate of the normal seasonal high <br />groundwater table at the boring locations. <br /> <br />Our recommendations, together with a/l data developed during the additional exploration. will be <br />incorporated Into our ongoing study and will be submitted In a written report upon conclusion of the <br />study. <br /> <br />COST ESTIMATE <br /> <br />The costs associated with the aforementioned tasks are estimated as follows. The total cost will <br />not be exceeded without prior authorization. <br /> <br />Stake Borings and Coordinate Utility locations with Sunshine State <br />One-Call by Senior Technician; 3 hours @ $58.00Ihour <br /> <br />$174.00 <br /> <br />Mobilize Drilling Crew and Equipment; <br />1 mobilization @ $180.OOImob. <br /> <br />SPT Borings; 6 borings x 25 l.t., <br />(0 - 50 I.f.) 150 l.t. @ $11.30IlJ. <br /> <br />$180.00 <br /> <br />Laboratory Classification Testing Allowance; estimate <br /> <br />$1,695.00 <br />$200.00 <br />$220.00 <br />$760.00 <br /> <br />Senior Project Engineer; 2 hours @ S110.OOIhour <br />Project Engineer; 8 hours @ $95.00Ihour <br />
The URL can be used to link to this page
Your browser does not support the video tag.