My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-1615 Electrical Improvements
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2005 Resolutions
>
05-1615 Electrical Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2005 1:59:12 PM
Creation date
10/27/2005 1:45:02 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
9/12/2005
Doc Number
05-1615
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Show annotations
View images
View plain text
<br />Week 9 <br /> <br />1. Set relocated 125kw generator and anchor. <br />2. Set new service distribution rack. <br />3. Set new 600 amp ATS in place. <br />4. Schedule for load test and sign off of 125kw generator. <br /> <br />Week 10 <br /> <br />I. Wire new power feed ITom Power Company transfonner to 600 amp ATS. <br />2. Wire new power feed ITom 600 amp ATS to MDP in main electrical room. <br />3. Wire new power feed ITom 600 amp ATS to 125kw generator. <br />4. Install raceway and wire to re-feed load center in Fire Station and tennL1'\ate in <br />MDP. <br />5. Schedule power outage for following week for the connection ofnew power feed <br />inMDP. <br /> <br />Week 11 <br /> <br />I. Terminate wire on new 600 amp ATS, 125kw generator, and MDP. <br />2. New 600 amp service complete into Public Works Building. <br /> <br />Week 12 <br /> <br />I. Training and close out. <br />2. Return all areas to like new sod replacement, patclùng, and painting of exterior <br />walls and conduits. <br />3. Final walk thru with City of Casselberry. <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).