Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
<br />Week 9 <br /> <br />1. Set relocated 125kw generator and anchor. <br />2. Set new service distribution rack. <br />3. Set new 600 amp ATS in place. <br />4. Schedule for load test and sign off of 125kw generator. <br /> <br />Week 10 <br /> <br />I. Wire new power feed ITom Power Company transfonner to 600 amp ATS. <br />2. Wire new power feed ITom 600 amp ATS to MDP in main electrical room. <br />3. Wire new power feed ITom 600 amp ATS to 125kw generator. <br />4. Install raceway and wire to re-feed load center in Fire Station and tennL1'\ate in <br />MDP. <br />5. Schedule power outage for following week for the connection ofnew power feed <br />inMDP. <br /> <br />Week 11 <br /> <br />I. Terminate wire on new 600 amp ATS, 125kw generator, and MDP. <br />2. New 600 amp service complete into Public Works Building. <br /> <br />Week 12 <br /> <br />I. Training and close out. <br />2. Return all areas to like new sod replacement, patclùng, and painting of exterior <br />walls and conduits. <br />3. Final walk thru with City of Casselberry. <br />