My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-1615 Electrical Improvements
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2005 Resolutions
>
05-1615 Electrical Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2005 1:59:12 PM
Creation date
10/27/2005 1:45:02 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
9/12/2005
Doc Number
05-1615
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />SmltltJ"1t Gtecteie, Dltc. <br /> <br />225 SMITHSON DR. <br />OVIEDO. FLORIDA 32765 <br />(407) 365·8906 <br />FAX (407) 365·7733 <br /> <br />PROPOSED CONSTUCTION SCHEDULE FOR <br />CITY OF CASSELBERRY <br />CITY HALL & PUBLIC WORKS BUILDING <br /> <br />September 7, 2005 <br /> <br />To: All parties interested <br /> <br />Subject: City Hall and Public works building emergency power system upgrade. <br /> <br />This is only a preliminary plan of events, which may change anytime during construction <br />due to weather, delivery of equipment and malerials, and unforeseen circumstances. <br />Some exact details have been left out, but understood to be complete. <br /> <br />Week 1 <br /> <br />I. Order all materials needed for construction project. <br />2. Apply for permits. (If applicable) <br />3. Pay appropriate fees and establish work order with Power Company (by others). <br />4. Locate all underground utilities. <br /> <br />Week 2 <br /> <br />I. Run underground conduits for City Hall 250 KW generator. <br />a. From Progress Energy's transfonner to 1200 amp auto transfer switch. <br />b. From 1200 amp auto transfer switch to MDP in main electrical room. <br />c. From 1200 amp auto transfer switch to new 250kw generator. <br />d. Intercept existing underground conduit for existing Christmas lighting <br />panel to MDP in main electrical room. <br />2. Back fill open trenches. <br /> <br />Week 3 <br /> <br />I. Grade and prepare ground (level) for new concrete pad for new 250kw generator. <br />2. Pour concrete pad for new 250kw generator (detailed foot-print required for <br />layout) . <br />
The URL can be used to link to this page
Your browser does not support the video tag.