Laserfiche WebLink
<br />~ <br /> <br />SmltltJ"1t Gtecteie, Dltc. <br /> <br />225 SMITHSON DR. <br />OVIEDO. FLORIDA 32765 <br />(407) 365·8906 <br />FAX (407) 365·7733 <br /> <br />PROPOSED CONSTUCTION SCHEDULE FOR <br />CITY OF CASSELBERRY <br />CITY HALL & PUBLIC WORKS BUILDING <br /> <br />September 7, 2005 <br /> <br />To: All parties interested <br /> <br />Subject: City Hall and Public works building emergency power system upgrade. <br /> <br />This is only a preliminary plan of events, which may change anytime during construction <br />due to weather, delivery of equipment and malerials, and unforeseen circumstances. <br />Some exact details have been left out, but understood to be complete. <br /> <br />Week 1 <br /> <br />I. Order all materials needed for construction project. <br />2. Apply for permits. (If applicable) <br />3. Pay appropriate fees and establish work order with Power Company (by others). <br />4. Locate all underground utilities. <br /> <br />Week 2 <br /> <br />I. Run underground conduits for City Hall 250 KW generator. <br />a. From Progress Energy's transfonner to 1200 amp auto transfer switch. <br />b. From 1200 amp auto transfer switch to MDP in main electrical room. <br />c. From 1200 amp auto transfer switch to new 250kw generator. <br />d. Intercept existing underground conduit for existing Christmas lighting <br />panel to MDP in main electrical room. <br />2. Back fill open trenches. <br /> <br />Week 3 <br /> <br />I. Grade and prepare ground (level) for new concrete pad for new 250kw generator. <br />2. Pour concrete pad for new 250kw generator (detailed foot-print required for <br />layout) . <br />