Laserfiche WebLink
<br />3. Payment <br />Requests (see attached for detailed breakdowns) <br /> <br />#1 - Reduce instrumentation scope <br /> <br />#2 - Relocate pipes at ground storage tanks <br />Additional time for building permit <br /> <br />#3 - Lower drain line <br />& roof repairs at Chlorine building <br /> <br />#4 - Electrical & instrumentation changes <br /> <br />#5 - Bar Screen walkway modifications <br /> <br />#6 - Additional wiring between Panels SP1 & SP2 <br /> <br />#7 - Sod retention area around GST <br />Fumish & install 400-amp breaker <br />Control panel revisions <br /> <br />#8 - GST discharge valve modification <br /> <br />#9 - Surge pump addition <br /> <br />Subtotal <br /> <br />Additional Bond Premium <br /> <br />Total <br /> <br />III. WAIVER <br /> <br />PROJECT NO. 0203 <br /> <br />$ <br />$ <br />$ <br /> <br />($ 38,717.00) <br />$ 3,742.00 <br /> 40 days <br />$ 975.00 <br />$ 900.00 <br />($ 1,434.00) <br />$ 3,980.00 <br />$ 2,900.00 <br />$ 1,610.00 <br />$ 3,013.00 <br />$ 4,178.00 <br />$ 1,665.00 <br />$ 96.200.00 <br />79,012.00 <br />-0- <br />79,012.00 <br /> <br />This Change Order constitutes full and mutual accord and satisfaction for the <br />adjustment in Contract Price and/or Time as a result of increases or decreases in <br />costs and time of performance caused directly and indirectly from the change. <br />Acceptance of this waiver constitutes an agreement between CITY and <br />CONTRACTOR that the Change Order represents an equitable adjustment to the <br />contract and that CONTRACTOR shall waive all rights to file a claim on this <br />Change Order. Execution of this Change Order shall constitute CONTRACTOR'S <br />complete acceptance and satisfaction that it is entitled to no more costs or time <br />(direct, indirect, impact, etc.) pursuant to this Change Order. <br /> <br />00940 - 3 <br />City of Casselberry <br /> <br />Version 4/01 <br />