My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-1405 Reclaimed Plant Change
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2003 Resolutions
>
03-1405 Reclaimed Plant Change
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2005 1:02:41 PM
Creation date
8/22/2005 1:02:28 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
2/24/2003
Doc Number
03-1405
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PROJECT NO. 0203 <br /> <br />II. WORK CHANGED BY CHANGE ORDER <br /> <br />1 . ReQuired ChanQes <br /> <br />#1 - Delete SCADA hardware and software. <br />#2 - Relocate piping under tank location. <br />Additional contract time. <br />#3 - Lower existing tank drain line. <br />Repair roof leaking on chlorine feed pumps and panels. <br />#4 - Delete level transmitters. Change analyzer manufacturer. <br />Other electrical changes. <br />#5 - Add walkway. <br />#6 - Additional wiring between Panels SP1 & SP2. <br />#7 - Sod slopes of retention areas. <br />Furnish and install larger breaker for relocated effluent pump. <br />Gut existing control panel, install plain cover panel. <br />#8 - Connect valve control wiring to main panel & program. <br />#9 - Add two new surge pumps, piping, slab, electrical and <br />controls. <br /> <br />2. Justification <br /> <br />#1 - Included in software provider's contract - duplicate. <br />#2 - Exact location unknown at time of bidding. <br />Contractor delayed by extended permitting time. <br />#3 - In conflict with proposed piping. <br />Prevent deterioration of pumps and panels and outages. <br />#4 - Transmitters not required. Standardize analyzer. Other <br />changes per construction requirements. <br />#5 - Configuration of screen motor mounting blocked walkway. <br />#6 - Field wiring omitted. <br />#7 - Sodding to minimize erosion. <br />Relocated pump has larger horsepower motor. <br />Eliminate confusion, add cover for aesthetics. <br />#8 - Remote operation of valves required for efficiency & weather. <br />#9 - Increased surge pumping capacity to meet increased plant <br />capacity. <br /> <br />00940 - 2 <br />City of Casselberry <br /> <br />Version 4/0i <br />