Laserfiche WebLink
<br />will be submitted in AutoCAD release 2004 format, and the technical specifications will be <br />submitted in Microsoft Word format. <br /> <br />2.1.9 The ENGINEER will submit an Engineers Opinion of Probable Construction Cost for the <br />project based on the 100% plan set. <br /> <br />2.1.10 The ENGINEER shall prepare and submit required permit applications associated with the <br />project to FDEP. The ENGINEER shall respond to one request for additional information <br />(RAI) received as a result of the submittal packages. All permit fees shall be paid by the <br />OWNER directly to the agency. <br /> <br />2.1.11 Bidding Assistance- The fOllowing tasks are included: <br /> <br />a. Coordinate bid process with City including advertisements and publications; <br />b. Provide interpretation and clarification of Contract Documents during bidding; <br />c. Participate in pre-bid meeting with prospective bidders; <br />d. Prepare and issue addenda as appropriate to interpret or clarify Contract <br />Documents; <br />e. Prepare bid tabulation sheets and assist City in evaluating bids; <br />f. Make a recommendation of contract award. <br /> <br />4 <br />