My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-2251 Sitek Agreement for Sausalito Shores Outfall Project at Lake Howell
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2011 Resolutions
>
11-2251 Sitek Agreement for Sausalito Shores Outfall Project at Lake Howell
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 4:00:20 PM
Creation date
4/7/2025 4:00:17 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
5/9/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGREEMENT <br />1. THIS AGREEMENT, made as of the 0& day of <br />2011, by and between the City of Casselberry, Florida, <br />hereinafter ca led the Owner and .5 'Ie.V, r V Orn k-; 00 hereinafter called the <br />Contractor. <br />WITNESSETH, that the Owner and the Contractor, for the considerations stated herein <br />agree as follows: <br />2. SCOPE OF WORK <br />The Contractor shall provide and furnish all of the necessary labor, supervision, material, <br />tools, expendable and permanent equipment , and all utility and transportation services required <br />to perform and complete in workmanlike manner, all of the work described as: "SAUSALITO <br />SHORES OUTFALL IMPROVEMENT PROJECT AT LAKE HOWELL" for the City of <br />Casselberry, Florida. <br />All work shall be performed in strict accordance with the Drawings & Specifications <br />prepared by the City of Casselberry Engineering Division, hereinafter called Engineer, and strict <br />compliance with the Contractor's Bid as accepted, including any amendments agreed upon at the <br />time of execution of this Agreement, and with the other Contract Documents herein mentioned <br />which are a part of this Agreement. <br />3. THE CONTRACT PRICE <br />The Owner shall pay the Contractor, and the Contractor shall accept, in full payment for the <br />performance of this Agreement, subject to any additions or deductions provided for hereby, <br />based upon unit prices and lump sum prices provided in the bid attached hereto, in current funds, <br />the Total Aggregate Amount shall not exceed the sum o£ Two Hundred and Two Thousand <br />Dollars and Zero Cents ($202,000.00) as lump sum contract. <br />Payments are to be made to the Contractor in accordance with and subject to the provision <br />embodied in the other documents, which are a part of this Agreement. <br />4. CONTRACT TIME AND LIQUIDATED DAMAGES <br />Work under this Agreement shall be commenced with thirty (30) days after issuance of <br />written Notice to Proceed and shall be completed within one hundred fifty (150) calendar days <br />from commencement of construction date to Substantial Completion from the issuance of the <br />
The URL can be used to link to this page
Your browser does not support the video tag.