Laserfiche WebLink
Planning & Zoning Commission/ <br />Local Planning Agency Minutes <br />April 10, 2024 <br />Page 2 <br />5. DISCLOSURE OF EX PARTE COMMUNICATIONS <br />No disclosures of ex -parte communications were made. <br />6. CONDITIONAL USE APPLICATIONS <br />There were no conditional use applications presented on this agenda. <br />7. SITE PLAN APPLICATIONS <br />A. SPR 24-04: Major Site Plan for Cheddar's Scratch Kitchen <br />Staff presentation: Matthew Linder, Planner I, presented SPR 24-04, a major site plan for Cheddars <br />Scratch Kitchen. The project is on two parcels between U.S. Highway 17-92 and Lake Concord. The <br />northern property was originally developed sometime between 1968 and 1972 as several separate <br />commercial buildings with parking areas surrounding them. The southern parcel was developed as a small <br />car dealership in the early 1980s. The buildings on the northern parcel were demolished in 2007, and the <br />property has remained vacant since; currently, it mostly consists of uneven concrete slabs and damaged <br />asphalt. The southern lot still has the building formerly used as a car dealership until 2013. <br />In 2023, staff began working with Cheddar's to bring a restaurant to the subject properties. The property <br />was rezoned to PMX-MID (Planned Mixed -Use: Medium Rise) to ensure consistency between the zoning <br />and Future Land Use Map (FLUM), and a Planned Unit Development (PUD) agreement was created in <br />preparation for the project via Ordinance 23-1588. Mr. Linder went on to note that through extensive <br />review, staff has ensured compliance with the applicable regulations of the overlay districts of the subject <br />property — the Lake Concord Overlay District (LCOD) and Community Redevelopment Area (CRA). It <br />was also evaluated per the approved PUD agreement and the Unified Land Development Regulations <br />(ULDR). <br />Regarding site design, Mr. Linder noted that the restaurant is proposed to sit closer to Lake Concord, with <br />the future outdoor dining area facing the lake. The parking lot provides ample parking, significantly <br />exceeding the minimum required by approximately 100 spaces. Stormwater retention will be dealt with via <br />an underground exfiltration system under the parking lot. Additionally, restaurants and similar <br />establishments are permitted uses in the adopted PUD Agreement, in the LCOD and CRA, as well as in the <br />PMX-MID zoning district. <br />The applicant's proposal meets all the relevant size and dimension requirements outlined in the adopted <br />PUD Agreement and the PMX-MID zoning district. The proposed heights are within the maximum <br />allowable height of the adopted PUD Agreement and the FAR is well below the maximum allowed. The <br />facade is compatible and harmonious with the surrounding area and the photometric plan conforms with <br />performance standards outlined within the ULDR. The design of the structure features many desirable <br />materials and has elevation changes to break up long facades. In addition, the building has also been <br />oriented to provide lake views to diners and the future outdoor dining area. <br />The proposed landscape plan satisfies all landscaping requirements and there is no new signage being <br />proposed with this project. It proposes the removal of 289 caliper inches, of which 38 canopy trees are <br />being planted. The remaining balance will be paid into the City's tree bank fund for mitigation. Staff <br />recommends that Planning and Zoning Commission/Local Planning Agency, recommend approval of case <br />number SPR 24-04, based on the staff report and the testimony and evidence presented, that the request <br />