My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-1994 Change Order No. 3 to Agreement with Inwood Consulting Engineers, Inc. for Design Services for Anchor Road
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2009 Resolutions
>
09-1994 Change Order No. 3 to Agreement with Inwood Consulting Engineers, Inc. for Design Services for Anchor Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2025 10:58:41 AM
Creation date
2/14/2025 10:58:33 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
1/12/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENT <br />Perform 5 Standard Penetration Test (SPT) borings to a depth of 50 feet each at the <br />proposed sheet pile wall locations. <br />+1 Perform routine laboratory soil classification tests to aid in visual soil classification. <br />! Analyze field and laboratory test data to analyze sheet pile walls, gravity walls and <br />concrete retaining walls as possible options. GEC will then develop geotechnical <br />recommendations for the chosen reatining wall design and installation. <br />Include the results of the investigation and wail analyses in an engineering report signed <br />and sealed by a geotechnical engineer licensed in Florida. <br />GEC proposes to perform the above scope of services for a Lump Sum Fee of $9,656.00. Our <br />schedule to complete the work and submit our report will be approximately 3 to 4 weeks <br />(excluding Holidays) from receiving authorization to proceed. We understand that January 23, <br />2009 is the targeted date to receive our report. If we are provided notice to proceed by <br />January 7, 2009 this should be possible. <br />If this proposal meets with your approval, please sign the attached Proposal Acceptance Sheet <br />and return one signed proposal to our office along with a scaled site plan showing the <br />proposed improvements. <br />GEC appreciates the opportunity to submit this proposal and we look forward to working with <br />you on this project. If any questions arise regarding our proposed services, please call. <br />Very truly yours, <br />GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS, INC. <br />Eric W��aowski, NE.I. Chr s t o p er P. Meyer, P.E. <br />Project En sneer Senior Geotechnical Engineer <br />CPM/EW N/kms <br />GEC Proposal No. 3762GI 2 Proposal for Geotechnical irnglneering rnvestlgatlon <br />Anchor Road StormWater I'morouements <br />z <br />p <br />F <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.