WHEREAS, the Final Design, which was completed by FDOT in 2007, identified certain physical <br />improvements to be completed for the System, such as roadway and similar physical improvements; and <br />WHEREAS, the City of Altamonte Springs has commenced construction of those physical improvements; <br />thus, construction of portions of the FlexBus infrastructure have advanced past the planning phase and <br />are now under construction; <br />WHEREAS, to now complete the FlexBus Transit System will require funding and final design of the <br />technical components of the FlexBus Transit System (the "Technical Component") which would include <br />additional hardware and software to supplement that set forth above, engaging a contractor to update <br />the Final Design documents, as well the acquisition of the actual buses for said system (all of which <br />funding is referred to as the "Additional Funding"); <br />WHEREAS, LYNX will serve as the lead agency in this initiative to acquire the Additional Funding, drawing <br />upon its mission to provide linkages between major activity centers, and now transit points, for its <br />riders; and <br />WHEREAS, Casselberry has expressed an interest in joining LYNX and Altamonte Springs in the initial <br />FlexBus deployment. <br />NOW, THEREFORE, the parties hereto agree as set forth below: <br />1. The Final Design of FlexBus requires review and update due to the passage of time since its <br />completion. In that regard: <br />a. LYNX, Altamonte Springs, and Casselberry will each assign a project manager as a point <br />of contact for the update of the Final Design documents. Attachment "A" lists the <br />project managers at the time of execution of this memorandum, however these are <br />subject to change upon the notification by one party to all other parties to this <br />agreement. <br />b. LYNX, Altamonte Springs, and Casselberry will work collaboratively to have the Final <br />Design documents, (which were completed by TranSystems in April 2007), updated in <br />order to prepare for the deployment of FlexBus service. In that regard: <br />I. The scope of services for the update of the Final Design documents will be <br />developed by the parties to this Memorandum prior to release. <br />ii. A contractor will be chosen using an existing contract with one of the parties, or <br />if the scope does not fit within an existing contract, a scope of services will be <br />released to competitively procure contractor services to undertake updating the <br />Final Design documents. <br />Memorandum of Understanding: Final Design and Implementation of FlexBus January 2011 <br />2 <br />