My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-2212 MOU for Design & Implementation of Flex Bus with LYNX & Altamonte Springs
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2011 Resolutions
>
11-2212 MOU for Design & Implementation of Flex Bus with LYNX & Altamonte Springs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2024 11:16:38 AM
Creation date
8/26/2024 11:16:32 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
1/10/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WHEREAS, the Final Design, which was completed by FDOT in 2007, identified certain physical <br />improvements to be completed for the System, such as roadway and similar physical improvements; and <br />WHEREAS, the City of Altamonte Springs has commenced construction of those physical improvements; <br />thus, construction of portions of the FlexBus infrastructure have advanced past the planning phase and <br />are now under construction; <br />WHEREAS, to now complete the FlexBus Transit System will require funding and final design of the <br />technical components of the FlexBus Transit System (the "Technical Component") which would include <br />additional hardware and software to supplement that set forth above, engaging a contractor to update <br />the Final Design documents, as well the acquisition of the actual buses for said system (all of which <br />funding is referred to as the "Additional Funding"); <br />WHEREAS, LYNX will serve as the lead agency in this initiative to acquire the Additional Funding, drawing <br />upon its mission to provide linkages between major activity centers, and now transit points, for its <br />riders; and <br />WHEREAS, Casselberry has expressed an interest in joining LYNX and Altamonte Springs in the initial <br />FlexBus deployment. <br />NOW, THEREFORE, the parties hereto agree as set forth below: <br />1. The Final Design of FlexBus requires review and update due to the passage of time since its <br />completion. In that regard: <br />a. LYNX, Altamonte Springs, and Casselberry will each assign a project manager as a point <br />of contact for the update of the Final Design documents. Attachment "A" lists the <br />project managers at the time of execution of this memorandum, however these are <br />subject to change upon the notification by one party to all other parties to this <br />agreement. <br />b. LYNX, Altamonte Springs, and Casselberry will work collaboratively to have the Final <br />Design documents, (which were completed by TranSystems in April 2007), updated in <br />order to prepare for the deployment of FlexBus service. In that regard: <br />I. The scope of services for the update of the Final Design documents will be <br />developed by the parties to this Memorandum prior to release. <br />ii. A contractor will be chosen using an existing contract with one of the parties, or <br />if the scope does not fit within an existing contract, a scope of services will be <br />released to competitively procure contractor services to undertake updating the <br />Final Design documents. <br />Memorandum of Understanding: Final Design and Implementation of FlexBus January 2011 <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.