My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-2212 MOU for Design & Implementation of Flex Bus with LYNX & Altamonte Springs
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2011 Resolutions
>
11-2212 MOU for Design & Implementation of Flex Bus with LYNX & Altamonte Springs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2024 11:16:38 AM
Creation date
8/26/2024 11:16:32 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
1/10/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Memorandum of Understanding <br />Final Design and Implementation of the North Orange/South Seminole Intelligent Transportation <br />Systems (ITS) Enhanced Circulator, now known as "FlexBus" <br />This Memorandum of Understanding is made and entered into this 315/ day of <br />2011 by and between the Central Florida Regional Transportation Authority (hereinafter `LYNX"), the <br />City of Altamonte Springs (hereinafter "Altamonte Springs"), and the City of Casselberry (hereinafter <br />"Casselberry"). <br />WHEREAS, LYNX previously partnered with the cities of Altamonte Springs and Maitland, METROPLAN <br />ORLANDO, the Florida Department of Transportation ("FDOT"), Federal Transit Administration ("FTA"), <br />and Orange and Seminole Counties to conduct a study (the "Study") of the North Orange/South <br />Seminole Intelligent Transportation Systems (ITS) Enhanced Circulator (now known as the Flex Bus <br />Transit System) ("FlexBus" or "FlexBus Transit System") which study was concluded in March 2002; and <br />WHEREAS, LYNX previously partnered with the cities of Altamonte Springs and Maitland to conduct the <br />Preliminary Design and Engineering and identifying Right -of -Way Acquisition (hereinafter "PD&E") in <br />relation to the Study, which was concluded in August 2004; and <br />WHEREAS, the City of Maitland requested that the first operational phase of service be limited to areas <br />outside of the incorporated area of Maitland, with the final design service area consisting of the City of <br />Altamonte Springs; and <br />WHEREAS, the Final Design and Engineering for Implementation of the FlexBus Transit System (the "Final <br />Design") was completed in April 2007 by TranSystems working with LYNX, Altamonte Springs, and FDOT; <br />and <br />WHEREAS, FDOT, Seminole County, Orange County and VolUSia County have committed to construct a <br />regional commuter rail system known as SunRail; and <br />WHEREAS, SUnRail's success is dependent upon, among other things, creating a viable feeder system <br />that will utilize circulators such as FlexBus and LYMMO to distribute riders; and <br />WHEREAS, linking SunRail stations to various points throughout the FlexBus Transit System is vital to <br />providing safe, reliable and efficient transportation options for citizens connecting to employment <br />centers, housing, educational centers and shopping; and <br />WHEREAS, reducing vehicle miles traveled, the creation of transit -oriented and bicycle and walkable <br />everyday travel patterns and the creation of compact development to aid in the protection of natural <br />resources shall be encouraged; and <br />WHEREAS, Altamonte Springs and LYNX have successfully obtained various federal earmarks in the <br />amount of $4.1 million, which have or will be used by LYNX to acquire certain hardware and related <br />software for the FlexBus Transit System; and <br />Memorandum of Understanding: Final Design and Implementation of Flexl3us 12/29/2010; 11:14 AM <br />{01594575;3} <br />
The URL can be used to link to this page
Your browser does not support the video tag.