My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
24-3409 Interlocal Agreement with Seminole County for Oxford Road Drainage and Sidewalks Project and English Estates Water Main Replacement
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
2024 Resolutions
>
24-3409 Interlocal Agreement with Seminole County for Oxford Road Drainage and Sidewalks Project and English Estates Water Main Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 8:22:11 AM
Creation date
8/1/2024 8:21:59 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
3/25/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
main as described on Exhibit A (in which "LS" means lump sum, "LF" means linear feet <br />and "EA" means each). <br />(c) COUNTY shall relocate the City's Utilities for CITY. CITY shall reimburse <br />the COUNTY for the costs of construction and Construction Engineering and Inspection <br />Professional Engineer Consultant ("CEI Consultant") services related to the CITY Utility <br />Work. The CEI Consultant services will be based on a percentage of the utility bid costs as <br />set forth in subsection 13 (b) below. The CEI Consultant will be a qualified professional <br />selected pursuant to Section 287.055, Florida Statutes (2023), or pursuant to a COUNTY <br />continuing contract, and CITY will have an opportunity to review and comment on the <br />proposals before COUNTY selects the CEI, but the decision will be made by the <br />COUNTY. <br />Section 3. Rights -of -Way. COUNTY Project and CITY Utility Work must <br />take place within COUNTY rights-of-way. COUNTY is not obligated to perform any <br />CITY Utility Work that requires COUNTY to acquire any property interests, including <br />temporary construction easements, beyond those already acquired by COUNTY. CITY is <br />responsible for acquiring and paying for any additional property interests or other rights <br />that may be necessary to complete the CITY Utility Work prior to COUNTY's <br />performance of the CITY Utility Work. <br />Section 4. Construction Plans. <br />(a) Inasmuch as the CITY Utility Work will occur in an area where COUNTY <br />plans to construct curb and gutter, to construct underground stormwater facilities, including <br />pipelines and appurtenant structures, and to construct sidewalks, it is in the best interest of <br />CITY and COUNTY to have the CITY Utility Work and roadway construction performed <br />Seminole County and City of Casselberry <br />Interlocal Utility Construction Agreement Oxford Road and English Estates Projects <br />Page 3 of 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.