My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
24-3409 Interlocal Agreement with Seminole County for Oxford Road Drainage and Sidewalks Project and English Estates Water Main Replacement
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
2024 Resolutions
>
24-3409 Interlocal Agreement with Seminole County for Oxford Road Drainage and Sidewalks Project and English Estates Water Main Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 8:22:11 AM
Creation date
8/1/2024 8:21:59 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
3/25/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project in order to meet CITY's needs and complete the work in a manner that is <br />economical and timely for CITY; and <br />WHEREAS, COUNTY is willing to include such work in COUNTY's Project <br />pursuant to the terms and conditions of this Agreement; and <br />WHEREAS, this Agreement is authorized by the provisions of Chapters 125, 163 <br />and 166, Florida Statutes (2023) and other applicable law, <br />NOW, THEREFORE, in consideration of the mutual covenants contained in this <br />Agreement and other good and valuable consideration, the receipt, adequacy and <br />sufficiency of which are hereby acknowledged, COUNTY and CITY agree as follows: <br />Section 1. Recitals. The above recitals are true and correct and form a material <br />part of this Agreement upon which the parties have relied. <br />Section 2. General. <br />(a) CITY acknowledges that certain of its existing utility (water) infrastructure <br />components are included within the geographic scope of the COUNTY Project. CITY <br />further acknowledges these components must be removed and new components installed <br />as shown on the CITY's construction plans and defined in Section 4 below, in this <br />Agreement referred to as the "CITY Utility Work." <br />(b) CITY Utility Work includes, but is not limited to, the relocation of potable <br />water mains, and other related infrastructure work, all as described in the Casselberry <br />Utility Work Pay Items, a copy of which is attached to and incorporated in this Agreement <br />as Exhibit A. The work consists of the removal, replacement and relocation of the water <br />Seminole County and City of Casselberry <br />Interlocal Utility Construction Agreement Oxford Road and English Estates Projects <br />Page 2 of 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.