My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
24-3409 Oxford Road Drainage and Sidewalks & English Estates Water Main Replacement Phase I
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2024 Resolutions
>
24-3409 Oxford Road Drainage and Sidewalks & English Estates Water Main Replacement Phase I
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 8:22:11 AM
Creation date
8/1/2024 8:21:59 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
3/25/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the lowest submitted bid for the CITY Utility Work. The successful bidder is referred to <br />in this Agreement as the COUNTY Contractor. <br />(d) Until twenty (20) days after either the execution of this Agreement by CITY <br />or the bid opening by COUNTY, whichever is later, CITY may elect to withdraw the CITY <br />Utility Work from the process by providing written notice to COUNTY. From twenty-one <br />(21) days after either the execution of this Agreement by CITY or the bid opening by <br />COUNTY, whichever is later, CITY shall not terminate this Agreement without providing <br />thirty (30) days written notice to COUNTY and paying all costs and expenses incurred by <br />COUNTY and COUNTY's Contractor for any CITY Utility Work completed at that point, <br />except in the event the COUNTY breaches this Agreement. <br />Section 8. Administration of County Construction Contract. <br />(a) Any communication by CITY with COUNTY's contractor during <br />construction must be through COUNTY or COUNTY's CEI Consultant. CITY is <br />authorized to consult with the CEI Consultant during the construction period regarding the <br />CITY Utility Work. Construction layout, construction coordination, including <br />coordination with other utilities, and scheduling all work are the sole responsibility of <br />COUNTY, the CEI Consultant, and COUNTY's Contractor and are not the responsibility <br />of CITY or CPH. <br />(b) COUNTY shall ensure that the CEI Consultant performs the following: (1) <br />schedule and attend the preconstruction meeting, progress meetings, and project closeout <br />meetings with COUNTY's Contractor; (2) provide on-site inspection services, engineering <br />services, and final quantities; (3) provide construction quality control (CQC) testing <br />Seminole County and City of Casselberry <br />Interlocal Utility Construction Agreement Oxford Road and English Estates Projects <br />Page 8 of 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.