My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
24-1592 Amended PUD Agreement and Concept Plan for Second Phase of Slovak Garden
Laserfiche
>
City Clerk's Public Records
>
Ordinances
>
2024 Ordinances
>
24-1592 Amended PUD Agreement and Concept Plan for Second Phase of Slovak Garden
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 7:55:31 AM
Creation date
8/1/2024 7:55:16 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Ordinances
City Clerk - Date
2/26/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
conducted by Traffic Mobility Consultants, dated September 5, 2023, and provided <br />to the City. <br />U. Minimum lighting standards per the City's Unified Land Development Regulations <br />shall be included on a separate illumination plan to be provided at the time of site plan <br />submittal. <br />V. Architectural controls and development on Phase I of the Subject Property shall follow <br />a common architectural theme as listed in this Agreement by harmoniously <br />coordinating the general appearance of all buildings and accessory structures. All <br />controls and variations shall be regulated in the Covenants and Restrictions and <br />enforced by the homeowners association (HOA) as defined within this Agreement. <br />1. Overlay districts: None. <br />2. Commercial design standards: N/A <br />W. Architectural controls and development on Phase II — Lot A (Residential) of the Subject <br />Property shall follow a common architectural theme as listed in this Agreement by <br />harmoniously coordinating the general appearance of all buildings and accessory <br />structures. All controls and variations shall be regulated in the Covenants and <br />Restrictions and enforced by the homeowners association (HOA) as defined within this <br />Agreement. <br />1. Overlay districts: None. <br />2. Commercial design standards: N/A <br />X. Architectural controls and development on Phase II — Lot B (Church) of the Subject <br />Property shall follow a common architectural theme as listed in this Agreement by <br />harmoniously coordinating the general appearance of all buildings and accessory <br />structures. <br />1. Overlay districts: None. <br />2. ULDR Article X — Appearance, Design, and Compatibility <br />Y. Utility provision and dedication: The Developer shall connect to the City of <br />Casselberry's central utility systems, where available, or to the South Seminole and <br />North Orange County Wastewater Transmission Authority (SSNOCWTA), where <br />applicable, at their sole cost. All utility fees shall be paid to the City of Casselberry <br />and/or SSNOCWTA before any building permit is issued. Central utility systems are <br />to be designed, permitted, and constructed to the respective service provider <br />specifications and dedicated to the respective service provider upon final inspection, <br />clearance, and acceptance by the service provider. <br />Z. Stormwater and environmental: Stormwater and environmental: The stormwater <br />system shall be owned and maintained by the Owner or their assigns and shall not be <br />dedicated to or become the responsibility of the City of Casselberry; however the City <br />or any other authority having jurisdiction will have the right to enter the Subject <br />Property to maintain the stormwater system if it falls into disrepair, and to lien the <br />Vi <br />
The URL can be used to link to this page
Your browser does not support the video tag.