Laserfiche WebLink
Attachment "A" <br />JRG0 <br />WATER AND WASTL WATER sOEUilON5 PROVIDER <br />September 27, 2010 <br />Mr. Mark Gisclar <br />Assistant Public Works Director <br />City of Casselberry <br />95 Triplet Lake Drive <br />Casselberry, Florida 32707 <br />RE: Scope of Work for <br />Casselberry ARRA Funded <br />Water Quality Improvement Projects — RFI#2 <br />Dear Mr. Gisclar: <br />We have prepared this proposal for professional engineering services to provide <br />assistance to the City for the above referenced project. <br />PROJECT DESCRIPTION <br />The water rehabilitation work included in this project covers the water quality <br />improvement projects submitted in the loan applications to the Florida Department of <br />Environmental Protection (FDEP). Each is intended to be completed as an individual <br />project to minimize the construction duration in any one area. <br />SCOPE OF WORK <br />Based on our understanding of the project we have prepared the following scope of work <br />to assist the City of Casselberry during the construction phase of this project. This <br />proposal includes providing construction observation from November 1, 2010 through <br />December 31, 2010 on the first set of grant projects, Casselberry Water Quality <br />Improvement Projects RFI#1. JRGO's previously approved Supplemental Agreement #1 <br />did not include construction observation and this proposal can be considered in addition <br />to Supplemental Agreement #1. Our proposal also includes anticipated 12 month <br />construction duration for the second set of grant projects, Casselberry Water Quality <br />Improvement Projects RFI#2. <br />JRGO's proposal is contingent on successfully negotiating a construction scope <br />expansion with Killebrew, Inc. to execute a Change Order covering Casselberry Water <br />Quality Improvement Projects 2 under the original contract requirements of Casselberry <br />Water Quality Improvement Projects RFI#1. The anticipated approved construction <br />schedule for the Casselberry Water Quality Improvement Projects RFI#2 is one year <br />starting January 1, 2011. <br />Our approach to on-site construction observation is to divide the work between CPH and <br />JRGO, with both firms having a representative on-site 2 days per week. We expect to <br />3560 Cardinal Point Dr. Suite 201 Jacksonville, FL 32257 <br />Office (904) 730-7994 Fax (904) 221-7521 <br />