My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-2200 Construction Administration/Inspection Services with JRGO
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2010 Resolutions
>
10-2200 Construction Administration/Inspection Services with JRGO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2022 11:33:57 AM
Creation date
8/17/2022 11:33:00 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
11/8/2010
Doc Number
10-2200
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Attachment "A" <br />JRG0 <br />WATER AND WASTL WATER sOEUilON5 PROVIDER <br />September 27, 2010 <br />Mr. Mark Gisclar <br />Assistant Public Works Director <br />City of Casselberry <br />95 Triplet Lake Drive <br />Casselberry, Florida 32707 <br />RE: Scope of Work for <br />Casselberry ARRA Funded <br />Water Quality Improvement Projects — RFI#2 <br />Dear Mr. Gisclar: <br />We have prepared this proposal for professional engineering services to provide <br />assistance to the City for the above referenced project. <br />PROJECT DESCRIPTION <br />The water rehabilitation work included in this project covers the water quality <br />improvement projects submitted in the loan applications to the Florida Department of <br />Environmental Protection (FDEP). Each is intended to be completed as an individual <br />project to minimize the construction duration in any one area. <br />SCOPE OF WORK <br />Based on our understanding of the project we have prepared the following scope of work <br />to assist the City of Casselberry during the construction phase of this project. This <br />proposal includes providing construction observation from November 1, 2010 through <br />December 31, 2010 on the first set of grant projects, Casselberry Water Quality <br />Improvement Projects RFI#1. JRGO's previously approved Supplemental Agreement #1 <br />did not include construction observation and this proposal can be considered in addition <br />to Supplemental Agreement #1. Our proposal also includes anticipated 12 month <br />construction duration for the second set of grant projects, Casselberry Water Quality <br />Improvement Projects RFI#2. <br />JRGO's proposal is contingent on successfully negotiating a construction scope <br />expansion with Killebrew, Inc. to execute a Change Order covering Casselberry Water <br />Quality Improvement Projects 2 under the original contract requirements of Casselberry <br />Water Quality Improvement Projects RFI#1. The anticipated approved construction <br />schedule for the Casselberry Water Quality Improvement Projects RFI#2 is one year <br />starting January 1, 2011. <br />Our approach to on-site construction observation is to divide the work between CPH and <br />JRGO, with both firms having a representative on-site 2 days per week. We expect to <br />3560 Cardinal Point Dr. Suite 201 Jacksonville, FL 32257 <br />Office (904) 730-7994 Fax (904) 221-7521 <br />
The URL can be used to link to this page
Your browser does not support the video tag.