My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-2184 Standard Consulting Agreement with Camp Dresser & McKee, Inc.
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2010 Resolutions
>
10-2184 Standard Consulting Agreement with Camp Dresser & McKee, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2022 4:53:45 PM
Creation date
8/16/2022 4:52:44 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
10/11/2010
Doc Number
10-2184
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Scope of Work <br />research. The CONSULTANT will provide in-house geotechnical services to perform <br />a total of two (2) soil borings, one at each project site, and develop a geotechnical <br />report including recommendations for removal of unsuitable material (if applicable), <br />structure bedding recommendations, compaction requirements, and seasonal high <br />water table elevations. CDM will provide the CITY a PDF copy of the geotech report <br />and survey, and a copy of the survey in AutoCAD format, conforming to CITY <br />standards. <br />Task 2 - Final Engineering Design Evaluation <br />Subtask 2.1 - Hydrologic and Hydraulic Evaluation <br />The CONSULTANT will develop a hydrologic/ hydraulic Interconnected Channel <br />and Pond Routing (ICPR) model, (Version 3.10) for each outfall to support the <br />proposed design and permitting effort. The proposed conditions model will become <br />the basis for final hydraulic design. The CONSULTANT will simulate the 1 -year, <br />mean annual, 25-, and 100 -year, 24-hour design storm events for both the existing and <br />proposed project conditions. The model results will be used as the supporting <br />documentation for the St. Johns River Water Management District (SJRWMD) <br />Environmental Resources Permit (ERP) application package. CDM will provide CITY <br />an executable copy of the finalized ICPR model. <br />Task 3 - Design Services <br />The CONSULTANT will prepare Drawings in general conformance with Florida <br />Department of Transportation (FDOT) and City of Casselberry Specifications and <br />Design Standards suitable for bidding and construction of the baffle box installations. <br />It has been anticipated that there will be approximately 6 general and civil <br />construction plan sheets. It has been assumed for budgeting purposes that the civil <br />design will include; baffle box design, riprap channel stabilization and grading. <br />Subtask 3.1 - Construction Documents <br />The design effort will include three submittal milestones by the CONSULTANT <br />corresponding to 60%, 90%, and 100% complete. The CONSULTANT shall use CITY <br />supplied Division 0 and Division 1 specifications and FDOT standard specifications. <br />The CONSULTANT will develop technical specifications and special provisions for <br />items not covered by FDOT specifications. For both the 60% and 90% milestone, the <br />CONSULTANT will submit two sets of half-size (11 -inch x 17 -inch) plans and a PDF <br />set of plans. At the 90% milestone, the CONSULTANT shall also provide <br />specifications and a bid tab with quantities, for review and comment by the CITY. For <br />the 100% milestone, the CONSULTANT will submit four sets of full size plans (22 - <br />inch x 34 -inch) bound, specifications, bid tab, and one compact disk (CD) containing <br />electronic files of the documents in AutoCAD and PDF format. Review comments <br />received from the CITY will be incorporated into the construction documents (plans <br />and specifications) as mutually agreed upon by the CITY and the CONSULTANT. <br />Subtask 3.2 - Engineer's Opinion of the Probable Construction Cost <br />The CONSULTANT will provide an Engineer's Opinion of the Probable Construction <br />Cost for the project at the 60% completion milestones and prepare a final opinion of <br />the probable construction cost estimate at the 100% milestone. <br />\\OrlsvWSEC\61762 -City of Casselberry\Baffle Boxes\Proposal\Scopo10Sep121.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.