My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-2162 Approval/Execution of Supplemental Agreement 2 to the Standard Consultant Agreement-Continuing Pro Water/Sewer utility Engineering Services
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2010 Resolutions
>
10-2162 Approval/Execution of Supplemental Agreement 2 to the Standard Consultant Agreement-Continuing Pro Water/Sewer utility Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2022 1:13:36 PM
Creation date
8/16/2022 1:12:07 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
8/23/2010
Doc Number
10-2162
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRAFT <br />TASK 12.0 — WATER QUALITY MASTER PLAN & CIP UPDATE <br />Based on the data collection and technical evaluations performed in the previous tasks, <br />the Water Quality Master Plan & CIP Update for the City of Casselberry will be <br />developed. Based on the conclusions of the water quality optimization, asset condition, <br />risk assessment and hydraulic evaluation of the existing distribution system and the <br />current CIP and projects proposed in the City's previous Water Master Plan, as well as an <br />evaluation of the City's water treatment facilities, REI will develop a capital <br />improvements program to address the R&R and maintenance of the existing <br />infrastructure, and develop a plan for expansion of the system to meet the needs for future <br />growth. <br />Task 12.1— CIP Update Program <br />REI will: <br />Review the City's previous Water Master Plan proposed projects and current CIP, <br />particularly related to reviewing the existing proposed projects. <br />- Based on the results of the alternative evaluations, REI will prepare a CIP for the <br />City's distribution system, operational maintenance, repair and replacements for the <br />10 -Year Planning Period. <br />- Prepare an implementation plan for the CIP. The individual projects identified in the <br />CIP will be incorporated into a master schedule by fiscal year and with project <br />justifications as part of an overall implantation plan. <br />Task 12.2 — Master Plan <br />REI will: <br />- Prepare and submit to the City for review and comment a detailed Master Planning <br />document summarizing all of the efforts of the previous tasks, including the CIP for <br />the 10 -Year planning period. <br />- Meet with the City staff to review the comments on the draft report. <br />Prepare and submit eight (8) "final" copies of the City of Casselberry's Water System <br />Master Plan (including two copies of the City's Model on compact disk). <br />Data Required: City staff availability <br />Deliverables: <br />♦ Master Plan Report <br />♦ Master Plan Report Review Meeting <br />♦ Water Distribution System Model on Compact Disc <br />Pagel 1 of 14 �=�-=� F t <br />
The URL can be used to link to this page
Your browser does not support the video tag.