Laserfiche WebLink
Florida Department of Transportation (FDOT) construction of the flyover at Red Bug Lake Road and SR <br />436 should be completed in FY 2014 and ground will break on the FDOT flyover on US Hwy 17-92 over <br />SR 436 during the year. The City has already distributed funds to FDOT to pay for utility relocation and <br />new mast arms at intersections on SR 436 at Oxford Road and at the Plaza Entrance for the Casselberry <br />Exchange. Included in these two major construction projects is for SR 436 to be milled and resurfaced <br />from Lake Howell Road (to the east) all the way to nearly Anchor Rd (to the west). This intense <br />commercial corridor will gain a whole new look. <br />The City will be completing in the first quarter of FY 2014 an extensive water quality project which <br />through the use of pipe bursting will replace over 20 miles of water mains in the City. The project, <br />valued in total at over $10 million, will have been paid for with almost $7 million in Federal and State <br />grants administered through the Florida Department of Environmental Protection (FDEP). The utility will <br />now be shifting attention to a very ambitious roster of capital improvement projects to be partially <br />funded with accumulated reserves. <br />It is expected that FDOT will award about $1.3 million in grant to the City for the construction of Section <br />3 of the Casselberry Greenway Bicycle and Pedestrian Trail System. Appropriation will occur when the <br />award is accepted. The City will continue to provide excellent solid waste collection, stormwater and <br />street light services with no increase to associated fees. Spectacular concerts and special events will <br />continue to be programmed at no cost to residents. Police Department fleet has been fully replaced and <br />no additional purchases are planned for several years. Savings is now being programmed in FY 2014 for <br />future replacement rather than the current method of capital lease borrowing. The Fire Department <br />will be deploying a new fire engine and rescue vehicle during the first quarter of FY 2014. <br />The City will achieve its many missions with efficient organization and no change to the requested <br />millage rate. A merit increase is requested for most employees that will average 3% overall. That said, <br />the proposed cost for personal services has been well controlled. Through reorganization, as well as, <br />pension and health benefit management, the workforce has been reduced by one from 237 to 236 and <br />the budgeted cost for the General Fund is actually lower than that requested for FY 2013. <br />BUDGET IN BRIEF <br />Preparation of the FY 2014 Proposed Budget called for continued conservation of resources and my <br />thanks are extended to the City's Department Directors who answered the call to keep personnel, <br />operating and capital requests in line with FY 2013 levels. The FY 2014 Proposed Budget City-wide <br />comes to $45,549,075 which is $1,899,686 greater than the FY 2013 Adopted Budget. <br />Spending growth is led by the Water and Sewer Fund where spending has increased by $3.07 million in <br />FY 2014. This increase is primarily due to stepped up capital improvement investment including the <br />construction of a granular activated carbon filter system at the south water production facility at a cost <br />of $2,000,000. It is needed to meet more stringent environmental standards. There are also many <br />other projects planned for water mains, lift stations, and water and sewer lines. Additional capital <br />improvement spending of $1,400,000 will come from the Neighborhood Capital Improvement Fund. It <br />will be used to continue the City's program of neighborhood road rehabilitation. The Casselberry <br />Redevelopment Agency (CRA) has plans for capital investment for property acquisition by $550,000 <br />during FY 2014. The CRA will draw from fund balance in order to achieve this purchase. Spending out of <br />A-2 <br />