My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13-2527 Amendment 1 to Supplemental Agmt 7 w Reiss Engineering, Inc - South Water Treatment Plant
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2013 Resolutions
>
13-2527 Amendment 1 to Supplemental Agmt 7 w Reiss Engineering, Inc - South Water Treatment Plant
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2022 10:30:40 AM
Creation date
6/8/2022 10:30:32 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
9/9/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REI prepared this scope of services as an amendment to Supplemental Agreement No. 7 <br />to include additional services required to incorporate a fifth GAC vessel and V -port hall <br />valve with automated controls into the design of the plant upgrades. This amendment <br />describes the proposed work along with the additional fee and schedule. <br />11. SCOPE OJF SERVICES <br />TASK 1.0 — UPDATE PRELIM INAIRY DESIGN REPORT <br />REI will update the preliminary design report (PDR) to reflect the increased flow to be <br />treated by the GAC process. REI will also revise schematic diagrams and plans for <br />inclusion into the PDR. The PDR will be submitted to the Florida Department of <br />Environmental Protection (FDEP) in accordance with Supplemental Agreement No. 7. <br />TASK 2.0 —UPDATE DESIGN <br />REI will update the 90% design documents to reflect the increased flow to be treated by <br />the GAC process. The design update includes: <br />reviewing design calculations, pipe size selection and equipment capacities <br />designing a V -port ball valve with automated controls for providing backpressure <br />to the GAC vessels <br />a modifying the general, civil, mechanical and electrical drawings <br />< , updating the technical specifications <br />TASK 3.0 .... CMAR COORDINATION <br />RFI will coordinate with the City and the CMAR to receive input in the design process by the <br />CMAR. RBI will perform the following: <br />Provide 90% design phase documents to CMAR. <br />Review CMAR comments on the 90% design phase documents and discuss with <br />CMAR. <br />� Attend two (2) CMAR coordination review meetings with the City and CMAR. <br />REI will provide meeting agendas, notes and action items resulting i1rom the <br />meeting. <br />REI will incorporate limited CMAR revisions into the design documents. <br />REI will provide general review of the CMAR's guaranteed maximum price <br />(GMP) and provide comments to the City. <br />E <br />
The URL can be used to link to this page
Your browser does not support the video tag.