My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PR 01/24/2022 City Commissioners Approve Two Major Infrastructure Projects for Casselberry
Laserfiche
>
City Clerk's Public Records
>
Press Releases
>
Press Releases Archives
>
PR 01/24/2022 City Commissioners Approve Two Major Infrastructure Projects for Casselberry
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2022 2:40:44 PM
Creation date
1/25/2022 2:40:43 PM
Metadata
Fields
Template:
City Clerk
Meeting Type
Special
City Clerk - Doc Type
Press Releases
City Clerk - Date
1/24/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br />For more information contact <br />Sara Brady <br />407-408-4000 <br /> <br />CITY COMMISSIONERS APPROVE TWO MAJOR <br />INFRASTRUCTURE PROJECTS FOR CASSELBERRY <br /> <br />CASSELBERRY, FL – Monday, January 24, 2022 - As part of the City’s continued investment in <br />infrastructure, City Commissioners this month approved two impactful multi-million-dollar <br />construction projects specific to road, sidewalk, sanitary sewer, and water main improvements. <br /> <br />Specifically, Commissioners approved $3.6 million for construction of the Lake Kathryn Circle <br />Complete Street Improvements project, an innovative design that improves pedestrian <br />connectivity and safety along the north-south portion of Lake Kathryn Circle from Seminola <br />Boulevard to the Laura Street/Wisteria Lane intersection. The project will essentially narrow the <br />existing road to 20 feet, creating space on the east side of the street for an eight-foot-wide <br />sidewalk and wide landscape areas, holding true to the City’s focus on increased walkability <br />throughout Casselberry. This project integrates water and sewer utility improvements that have <br />the potential to convert septic tanks to sanitary sewer, helping reduce pollutant loads to Lake <br />Kathryn. <br /> <br />The Commission also approved $1.9 million for improvements to the City’s potable water <br />distribution system along U.S. Highway 17-92 from State Road 436 to Ridge Road. The scope of <br />this project includes installation of about 4,400 feet of 12-inch water main to connect the water <br />distribution system from Lake of the Woods Boulevard to East Altamonte Drive. This project is <br />designed to improve water quality, address isolation issues caused by dead-end service points <br />and reduce the risk of service loss for customers being served by a single main source. The City <br />provides treated potable water to residents through about 200 miles of pipe that make up its <br />distribution system. <br /> <br />As part of the Lake Kathryn Circle project, which will be partially funded by grant monies from <br />the Florida Department of Environmental Protection (FDEP), improvements will include <br />construction of about 3,000 linear feet of gravity sewer, installation of manholes and sanitary <br />service laterals leading to the anticipated decommissioning of more than 30 septic tanks along <br />with roadway restoration. This anticipated completion date is March 2023. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.